Chapter VII: Part II: Main Thoroughfares (3)
In the absence of complete and accurate information as to grades and distances throughout these two routes, it is impossible to say which is to be preferred. If, upon further study on the basis of reliable topographical data, it should develop that a materially better gradient can be secured by the longer route, that line would be the more desirable. But if the saving in gradient should prove to be very slight, perhaps not more than a third or a half of one percent, it is believed that the shorter route, that via Climax Street, should be adopted.
76. _Arlington Avenue and Washington Avenue Connection._--Arlington Avenue is the direct road east from the junction of Washington Avenue and the Brownsville Road, but between this point and South Eighteenth Street it has two bad gradients, 7 per cent and over. To get a good cross-town connection without such gradients and at the same time to give better access to the Mount Oliver incline, Washington Avenue should be widened east from the Knoxville incline to Amanda Street,[21] and thence cut through on a curve to the corner of Angelo and Mount Oliver Streets. By widening Mount Oliver and Freeland Streets, by rounding off the east corner of Amanda and Freeland Streets and by cutting back the southwest corner of Freeland and South Eighteenth Streets, a nearly level, though somewhat circuitous, connection can be secured between Washington Avenue on the west and Arlington Avenue on the east.
77. _South Eighteenth Street._--Plans have been proposed, by the Bureau of Surveys, to widen, pave and otherwise improve South Eighteenth Street from the South Side up the hill to Arlington Avenue. The gradient, which is now about 7 per cent, cannot be improved without very radical and costly changes in the street location; and since the proposed South Hills tunnel will reach, on easy gradients, practically all the hilltop territory now served by South Eighteenth Street, the trouble and cost of materially reducing the South Eighteenth Street gradient seems hardly justified.
The plans of the Bureau of Surveys propose a roadway width of 40 feet with two sidewalks each 10 feet wide in some places and in others 7½ feet. This means a widening of from 5 to 20 feet. As this entire section of South Eighteenth Street is on a hillside mostly steeper than one in three, such widening will require from 2 to 7 feet of additional retaining wall, or excessive cutting and filling, which means large damage to property in the vicinity. Furthermore, the adjacent hillsides are so steep that no extensive development of abutting property is likely to take place.
In consideration of all these points it is urged that a width of not less than 45 feet nor more than 50 feet be adopted in the improvement plans. This will give a roadway 35 feet and one sidewalk 10 feet or more in width.
78. _Brownsville Road._--The Brownsville Road, climbing the hill from Carson Street, is similarly situated. Any improvements which may be contemplated therein should be governed by the same considerations as those cited above in connection with South Eighteenth Street.
79. _South Tenth Street._--From the south end of the Tenth Street bridge to Muriel Street, South Tenth Street is cramped down to a total width of 45 feet, with a roadway only 26½ feet wide, because of a freight area 10 or 12 feet wide next to the Oliver Iron and Steel Company building. This area should be covered and the street widened.
80. _Twenty-Second Street Bridge Approach--South Side._--The approach from East Carson Street to the Twenty-second Street bridge is cramped and crooked. The corner from the bridge into Wharton Street should be rounded back and an additional approach should be run along the east side of the playground. Some additional playground space can be secured by closing Sidney Street, between South Twenty-second Street and South Twenty-third Street, except for pedestrians. (Diagram No. 12.)
Several other changes in the outlying thoroughfares are marked in red on the accompanying plan but are not specifically noted in this report. They are suggested changes to improve certain steep gradients but have not been thoroughly studied on the ground.
SUBJECT INDEX TO OUTLYING THOROUGHFARE
IMPROVEMENTS
SECTION PAGE
Allegheny River Boulevard 61 79
Ardmore Thoroughfare 42 73
Arlington Avenue and Washington Avenue Connection 76 85
Aspinwall Bridge 10 59
Batavia Street 33 71
Bates Run Connection 15 63
Baum Street Improvement 20 65
Beechview Thoroughfare 73_a_ 83
Beechwood Boulevard Connection 28 68
Beechwood Boulevard Re-alignment 31 70
Bell Avenue Extension 41 73
Boundary Street Improvement 29 69
Braddock Avenue--Northerly End 36 72
Braddock Avenue Viaduct 37 72
Brighton Road Viaduct 53 76
Brownsville Road 78 86
Butler Street Improvement 8 59
California Avenue and Brighton Road Extension 52 75
Carrick Connection from the South Hills Tunnel 75 84
Carson Street 64 79
Center Avenue Improvement 21 65
Chartiers Avenue Grade Crossing 65 80
Corliss Street 67 80
Crafton-Carnegie Connection 69 81
Crafton Hillside Thoroughfare 68 81
Dravosburg and Mifflin Township Thoroughfare 47 74
Duquesne Bridge 51 75
East Ohio Street 57 77
East Street 54 76
Eighth Avenue Branch to Dravosburg 50 75
Eighth Avenue Branch Westward 49 75
Eighth Avenue Improvement 48 75
Ellsworth Avenue Extension 13 62
Etna Improvement 59 78
Fairhaven County Road 74 84
Fifth Avenue--Center Avenue Connection at Soho 12 61
Forbes Street Extension 39 72
Forbes Street--Fifth Avenue Connection at Soho 11 60
Forty-third Street Bridge 6 59
Glenwood Bridge 19 64
Greenfield and Squirrel Hill Extension 17 64
Greenfield Avenue Connection 16 64
Greensburg Pike 44 74
Greensburg Pike South of Turtle Creek 45 74
Haights Run Bridge 9 59
Haights Run Thoroughfare 25 67
Hamilton Avenue Extension 22 65
Hazelwood Grade Crossing 18 64
Lang Avenue Connection 73_c_ 83
Larimer Avenue Extension 24 66
Lowry's Lane 56 77
Main Street Grade Crossing 62 79
Meadow Street Connections 26 68
Millvale Thoroughfare 58 78
Monongahela Hillside Thoroughfare 14 62
Murray Avenue Extension 30 69
Negley Run Boulevard 23 66
Penn-Liberty Connection at Howley Street 5 58
Rankin Improvement 38 72
Sassafras Street Outlet 4 58
Sawmill Run Hillside Thoroughfare 73_d_ 83
Sawmill Run Thoroughfare 71 81
Second Avenue Extension 32 70
Sharpsburg Bridge 7 59
Sixteenth Street Bridge 1 56
South Eighteenth Street 77 85
Southern Avenue Connection 72_b_ 82
South Tenth Street 79 86
Squaw Run Thoroughfare 63 79
Stanton Avenue Connection to the Lincoln District 27 68
Streets Run 46 74
Sycamore Street Grade Crossing and Bridge Street Improvement 60 78
Thirty-third Street Improvement 3 57
Troy Hill Road 55 77
Twenty-eighth Street Grade Crossings 2 57
Twenty-second Street Bridge Approach--South Side 80 86
Washington Avenue Improvement 72_a_ 82
Washington Road 70 81
West Broadway Extension 73_b_ 83
Wilkinsburg-Edgewood Connection 35 71
Wilkinsburg Grade Crossings 34 71
Wilkins Township Thoroughfares 43 73
Wind Gap Road 66 80
Woodstock Avenue Extension 40 73
NUMBER INDEX TO OUTLYING THOROUGHFARE
IMPROVEMENTS
SECTION PAGE
1 Sixteenth Street Bridge 56
2 Twenty-eighth Street Grade Crossings 57
3 Thirty-third Street Improvement 57
4 Sassafras Street Outlet 58
5 Penn-Liberty Connection at Howley Street 58
6 Forty-third Street Bridge 59
7 Sharpsburg Bridge 59
8 Butler Street Improvement 59
9 Haights Run Bridge 59
10 Aspinwall Bridge 59
11 Forbes Street--Fifth Avenue Connection at Soho 60
12 Fifth Avenue--Center Avenue Connection at Soho 61
13 Ellsworth Avenue Extension 62
14 Monongahela Hillside Thoroughfare 62
15 Bates Run Connection 63
16 Greenfield Avenue Connection 64
17 Greenfield and Squirrel Hill Extension 64
18 Hazelwood Grade Crossing 64
19 Glenwood Bridge 64
20 Baum Street Improvement 65
21 Center Avenue Improvement 65
22 Hamilton Avenue Extension 65
23 Negley Run Boulevard 66
24 Larimer Avenue Extension 66
25 Haights Run Thoroughfare 67
26 Meadow Street Connections 68
27 Stanton Avenue Connection to the Lincoln District 68
28 Beechwood Boulevard Connection 68
29 Boundary Street Improvement 69
30 Murray Avenue Extension 69
31 Beechwood Boulevard Re-alignment 70
32 Second Avenue Extension 70
33 Batavia Street 71
34 Wilkinsburg Grade Crossings 71
35 Wilkinsburg-Edgewood Connection 71
36 Braddock Avenue--Northerly End 72
37 Braddock Avenue Viaduct 72
38 Rankin Improvement 72
39 Forbes Street Extension 72
40 Woodstock Avenue Extension 73
41 Bell Avenue Extension 73
42 Ardmore Thoroughfare 73
43 Wilkins Township Thoroughfares 73
44 Greensburg Pike 74
45 Greensburg Pike South of Turtle Creek 74
46 Streets Run 74
47 Dravosburg and Mifflin Township Thoroughfare 74
48 Eighth Avenue Improvement 75
49 Eighth Avenue Branch Westward 75
50 Eighth Avenue Branch to Dravosburg 75
51 Duquesne Bridge 75
52 California Avenue and Brighton Road Extension 75
53 Brighton Road Viaduct 76
54 East Street 76
55 Troy Hill Road 77
56 Lowry's Lane 77
57 East Ohio Street 77
58 Millvale Thoroughfare 78
59 Etna Improvement 78
60 Sycamore Street Grade Crossing and Bridge Street Improvement 78
61 Allegheny River Boulevard 79
62 Main Street Grade Crossing 79
63 Squaw Run Thoroughfare 79
64 Carson Street 79
65 Chartiers Avenue Grade Crossing 80
66 Wind Gap Road 80
67 Corliss Street 80
68 Crafton Hillside Thoroughfare 81
69 Crafton-Carnegie Connection 81
70 Washington Road 81
71 Sawmill Run Thoroughfare 81
72_a_ Washington Avenue Improvement 82
72_b_ Southern Avenue Connection 82
73_a_ Beechview Thoroughfare 83
73_b_ West Broadway Extension 83
73_c_ Lang Avenue Connection 83
73_d_ Sawmill Run Hillside Thoroughfare 83
74 Fairhaven County Road 84
75 Carrick Connection from the South Hills Tunnel 84
76 Arlington Avenue and Washington Avenue Connection 85
77 South Eighteenth Street 85
78 Brownsville Road 86
79 South Tenth Street 86
80 Twenty-second Street Bridge Approach--South Side 86
+--------------------------------------+
| LOCATION MAP FOR 80 IMPROVEMENTS IN |
| THE OUTLYING THOROUGHFARES |
| |
| (ATTACHED OPPOSITE THIS PAGE 92) |
+--------------------------------------+
FOOTNOTES:
[5] English street cars are narrower than American cars.
[6] Dr. Stübben's "Der Stadtebau," pp. 69 and 622.
[7] "AN ACT.--Defining the line of Chestnut Street in the City of Philadelphia. Section 1. Be it enacted by the Senate and House of Representatives of the Commonwealth of Pennsylvania in General Assembly met, and it is thereby enacted by the authority of the same, That the south line of Chestnut Street, between the rivers Delaware and Schuylkill, shall be at the distance of (539) five hundred and thirty-nine feet southward of the south side of Market Street: Provided, That this act shall not interfere with any buildings now erected on the south side of Chestnut Street. Approved the twenty-eighth day of April, Anno Domini 1870.
"AN ORDINANCE.--To provide for the widening of Chestnut Street on the City Plan: Section 1. The Select and Common Council of the city of Philadelphia do ordain that the Department of Surveys be and is hereby authorized to revise the City plan so as to make Chestnut Street from the Delaware River to the Schuylkill River of the width of sixty (60) feet, widening equally on both sides from the old center line. Section 2. After confirmation and establishment of said lines it shall not be lawful for any owner or builder to erect any new building or to rebuild or alter the front of any building now erected, without making it recede so as to conform to the lines established for a width of sixty (60) feet. Approved the thirty-first day of March, A. D. 1884.
SAMUEL G. KING, Mayor of Philadelphia."
[8] Act of December 20, 1871, Pamphlet Laws of 1872, p. 1390; and Act of May 16, 1891.
[9] Public Statutes, Sec. 2261 m.
[10] Methods of widening are fully discussed on pages 37 to 42.
[11] Map at the end of Part II.
[12] See Part V, Special Report on the Allegheny River Bridges.
[13] See Part V, Special Report on the Allegheny River Bridges.
[14] See Part IV Section 1, page 117.
[15] This improvement is provided for in the current bond issue.
[16] See Part IV, Section 15, page 121.
[17] Part IV, Section 8, page 119.
[18] This improvement is provided for in the current bond issue.
[19] Part IV, Section 7, page 119.
[20] Part IV, Section 7, page 119.
[21] Improvement to this point is provided in the current bond issue.