Chapter V: Appendix
DUTIES OF THE INSPECTOR OF ORDNANCE.—LIST
OF ARTICLES IN OUTFIT, WEIGHTS AND
STOWAGE SPACE.
DUTIES OF THE INSPECTOR OF ORDNANCE AT THE NAVY
YARD IN CONNECTION WITH THE TORPEDO
OUTFIT OF A SHIP.
GUN-COTTON MAGAZINE.
He will carefully inspect the gun-cotton magazine, satisfy himself that it is constructed in accordance with the Ordnance Instructions concerning shell-rooms, and the directions given on pages 40 and 41 Spar-Torpedo Instructions, that it is of sufficient size to stow the portion of the torpedo outfit defined in the “Table showing Weight, Space and Place of Stowage of Articles in Spar-Torpedo Outfit” and will prepare a plan of stowage.
TORPEDO STOREROOM.
He will carefully inspect the torpedo store-room, satisfy himself that it is in a proper position with regard to battery and boilers, that it is not exposed to undue changes of temperature, or to accidental admission of water, and that it is of sufficient capacity and conveniently arranged to stow the portion of the outfit defined in “Table showing Weight, Space and Place of Stowage of Articles in Spar-Torpedo Outfit.”
BATTERY LOCKER.
He will carefully inspect the battery locker and see that it is in a proper position with regard to the great-gun battery and the boilers. It should, preferably, be in a good light.
SHIP‘S SPARS AND FITTINGS.
He will, while the ship‘s spars and fittings are being made and when they are in place, inspect them carefully, satisfy himself that the spar-bands are properly spaced and in line to receive the secondary spar and report to the Bureau the position and class of the heel fittings and the leads of topping-lifts and guys, with his opinion of their efficiency and convenience.
PERMANENT WIRES.
He will ascertain what firing apparatus the Bureau intends to place on board and make a requisition for the necessary wire and terminals.
Upon the receipt of these articles he will locate the firing apparatus and prepare and place the permanent wires and terminals.
He will cause a plan showing the lead of the different wires to be made, and will send copies to the Bureau and to the Torpedo Station, and will furnish one to the commanding officer of the vessel.
No fixed rules can be given for leading permanent wires. The general method of leading the upper-deck wires, manner of securing to terminals and precautions to be observed, are given on pages 14 and 15. Permanent wires should also be led from the battery to the firing-point on the bridge or elsewhere. In case of electrical gun-circuits being desired, special directions or plans will be issued by the Bureau of Ordnance.
LIST OF ARTICLES IN SPAR-TORPEDO OUTFIT
SUPPLIED FROM THE TORPEDO STATION.
The Spar-Torpedo Outfit for ships having one torpedo boat comprises the articles given in the list. Ships having two or more torpedo boats will have the articles in the Boat‘s Outfit, necessary to the simultaneous use of all the boats, increased proportionally.
Ship‘s
Boat‘s and
Outfit. Boat‘s
Outfit. BOX 1.
1 Farmer‘s D. E. machine, Pattern A, containing:—
1 Firing-key.
2 Machine connecting-wires (12 feet long).
1 Crank.
BOX 2.
1 1 Reel box, containing:—
300 300 Feet double-conductor insulated cable.
1 1 Crank.
BOX 3.
1 1 Supply-box, containing:—
1 1 Monkey wrench.
3 3 Open-end wrenches.—One end fits the screw-cover
of the torpedo-case; the other, the screw-bolts
that secure the spindle.
1 1 Rectifier,—a wooden rod, marked in inches, for
lining the blocks in the primer-case.
6 12 Pieces of emery cloth,—for brightening wires and
removing rust.
1 2 Pairs of cutting plyers,—for general use in
cutting and working wires.
1 2 Pieces of okonite tape,—for insulating naked
wires when not exposed to water.
2 2 Earth-plates,—copper plates (coated with tin to
prevent rust).
12 24 Pieces of rubber tubing,—for insulating splices.
1 1 Sample splice,—for instruction.
1 2 Spools of hemp twine,—for securing rubber tubing.
1 2 Knives,—for cleaning wires and for general use.
1 1 Screw-driver,—for general use.
6 12 Dummy detonators (painted white),—for instruction.
1 1 Sample detonator splice,—for instruction.
1 1 Dummy gunpowder fuze,—for instruction.
24 36 Spherical rubber packings.
36 36 Paper fasteners.
2 2 Safety-pins for circuit-closer (spare).
1 1 Spring for circuit-closer (spare).
1 1 ⅜ by 16 screw-tap,—to cut a thread for
spar screws.
12 12 Screws for boat‘s steel spars,—to secure the two
parts of a boat spar.
4 4 Reeving-lines,—for reeving leading-wires through
the boat‘s spars.
2 2 Reeving-line weights,—to reeve the reeving-lines
through the boat‘s spars.
BOX 4.
1 Wire-box, ship‘s, containing:—
4 Spar leading-wires.
2 Machine connecting wires-(12 feet long, spare).
BOX 5.
4 Spar-bands with key-ways.
4 ” (ordinary).
24 Wood screws.
BOX 6.
4 8 Tin boxes, containing:—
4 8 Detonator-blocks.
32 64 Detonators.
BOX 7.
32 32 Gunpowder igniters.
18 18 ” fuzes.
BOX 8.
2 4 Glass jars with corks, containing:—
12 24 Blocks dry gun-cotton.
BOX 9.
1 Testing and firing plate
(when specially ordered).
BOXES 10 AND 11.
12 Secondary spars, ship‘s.
12 Keys for same.
BOXES 12 AND 13.
12 12 Secondary spars, boat‘s.
12 12 Toggles for same.
BOX 14.
1 1 Farmer‘s D. E. machine, Pattern C, containing:—
2 2 Machine connecting-wires (12 feet long).
1 1 Crank.
BOX 15.
1 1 Wire-box, boat‘s, containing:—
4 4 Spar leading-wires.
2 2 Machine-connecting wires (12 feet long, spare).
4 4 Secondary spar caps.
4 4 Rivets for same.
4 4 Secondary spar butts.
4 4 Rivets for same.
BOX 16.
1 1 Chemical box, containing:—
2 2 Pair forceps.
2 2 ” scissors.
2 2 Bottles distilled water.
2 2 ” for litmus-paper.
½ ½ Quire litmus-paper.
1 1 Tin cylinder for same.
2 2 Pounds carbonate of soda (dry).
1 1 Piece boiled tape.
2 2 Glass rods.
BOX 17.
2 2 Spar clamps.
1 1 Set of boat-fittings, Pattern B, as follows:—
2 2 Heel-rests.
2 2 Hinge-plates.
2 2 ⅝ bolts with nuts,—for securing heel-rests to
hinge-plates.
2 2 Swivel-crutches,—each with a hinged top and two
rollers, secured together by studs, rivets
and pins.
2 2 Bearings secured to crutches with bolts and
washers.
1 1 Cross-beam with two bearings riveted on.
2 2 Hoods, (right and left),—each fitted with two
bolts for securing to the cross-beam.
2 2 Securing rods,—for securing elevating-arms to
cross-beam.
2 2 Elevating-arms with cog-wheels attached.
2 2 Plate washers,—for holding elevating-arms on
cross-beams.
2 2 Nuts on ends of securing rods,—to hold washers
in place.
2 2 Guide rings,—each fitted with a roller secured
by studs and split pins.
2 2 Screw-nuts,—each fitted with a lock-screw,
to secure guide rings to elevating-arms.
2 2 Worm shafts,—each in two parts, joined by
a hook-coupling.
2 2 Elevating-wheels,—with pins for securing same
to worm shafts.
2 2 Clutches, consisting of the following parts:—
2 2 Bearings.
2 2 Sleeves,—with trunnions and lugs.
2 2 Yoke-links.
2 2 Detaching-levers,—each with transverse roller
attached.
2 2 Pins,—for locking detaching-levers.
4 4 Bolts with split pins,—for securing parts of
clutch together.
16 16 ⅝ bolts,—for securing hinge-plates, swivel-crutch
bearings and clutch-bearings to boat.[1]
16 16 ⅝ phosphor-bronze nuts for same.
4 4 ¾ bolts,—for securing cross-beam bearings to
deck.[2]
4 4 ¾ phosphor-bronze nuts for same.
BOX 18.
1 1 Testing magneto.
BOXES 19 TO 22. (_Both inclusive_).
2 2 Boat spars.
2 2 Canvas bags for same.
BOXES 23 TO 46. (_Both inclusive_).
12 24 Service Torpedoes, Pattern D.
BOXES 47 AND 48.
BOXES 49 AND 50.
12 12 Exercise Torpedoes, Pattern D,
(two of which are empty).
BOXES 51 AND 52.
BOX 53.
12 24 Service Torpedo spindles.
12 12 Exercise ” ”
24 36 Torpedo pins.
4 8 ” ” (spare).
BOX 54.
1 Ship‘s firing-battery.
1 Battery tester (6.5 ohms).
1 1 Boat‘s firing-battery.
2 2 Spare cells for same.
1 1 Battery tester (4 ohms).
1 2 Hand-firing keys.
3 5 Pounds sal-ammoniac.
12 12 Spare fuze bridges,—for testing batteries.
BOX 55.
1 1 Steam-drier.
BOX 56.
4 4 Circuit-closers,—for Contact Torpedo.
4 4 Spherical rubber packings for same.
4 4 Rubber diaphragms for same.
16 16 Brass screws,—for attaching circuit-closer.
BOX 57.
1 1 Contact spar leading-wires.
2 2 Rubber diaphragms (spare).
12 12 ” washers,—for Exercise Torpedo (spare).
12 24 ” ” —for Service Torpedo (spare).
4 8 Spherical rubber packings (spare).
In addition to the above, if no testing and
firing-plate is furnished,
2 Electric switches.
[1] =_Note._=—These bolts are supplied at the Navy Yard where the boats are fitted.
[2] =_Note._=—These bolts are supplied at the Navy Yard where the boats are fitted.
Two Copies of the Torpedo Instructions, corrected to date of issue, will be furnished to each vessel receiving a torpedo outfit.
These copies will be sent by mail, simultaneously with the issue of the outfit, addressed to the Inspector of Ordnance at the Navy Yard at which the vessel is fitted out.
* * * * *
This book is corrected to
* * * * *
Terminals and insulated wire for permanent wires will be furnished as required.
The Bureau of Ordnance will designate which of the following will be supplied:—
2 Electric switches.
1 Testing and firing-plate.
SUPPLIED FROM NAVY YARD.
Torpedo-spars for ship.
Fittings for same.
16 16 ⅝ bolts,—for securing boat-fittings to boat.
4 4 ¾ ” ” ” ” ” ” ”
=_Note._=—Boxes 6, 7, 8, 23 to 46 inclusive, 49 and 50,
contain explosives, which must be stowed as directed in the
Instructions.
Boxes 8 and 16 contain glass and are to be handled with care.
Boxes 2, 4, 15 and 57 contain insulated wire and must be stowed in
a cool place to guard against deterioration of the insulation.
All other boxes must be stowed in a dry place and the contents kept
free from rust.
+---------------------------------------------------------------+
| Table Showing Weight, Space and Place of Stowage of Articles |
| in Torpedo Outfit. |
+===========+========+==================+===========+===========+
| | | | | |
| |Invoice |OUTSIDE DIMENSIONS|Approximate|Approximate|
| WHERE | number | OF BOX IN INCHES | cubical | gross |
| STOWED. |of boxes+------------------+ space of | weight of |
| | | L. W. D. | each box | each box |
| | | | | |
+-----------+--------+------------------+-----------+-----------+
| | | | Cu. ft. | Lbs. |
|GUN-COTTON |23 to 26| 11.8 11.8 17.8 | 1.4 | 72. |
| MAGAZINE. | 49, 50 | 13.8 12.9 17. | 1.8 | 66. |
+-----------+--------+------------------+-----------+-----------+
| | 1 | 16. 13.5 20.5 | 2.6 | 146. |
| | 2 | 18.5 15.2 17.5 | 2.8 | 92. |
| | 3 | 20. 16. 10.5 | 1.9 | 48. |
| | 4 | 16.5 16.5 16. | 2.5 | 67. |
| | 10, 11 | 98.5 14. 5. | 4. | 222. |
| | 12, 13 | 102. 21. 6. | 7.4 | 230. |
| | 14 | 12.6 11. 16.5 | 1.3 | 54. |
| TORPEDO | 15 | 16.6 16.6 16. | 2.6 | 68. |
|STOREROOM. | 16 | 19. 11.6 12.6 | 1.6 | 30. |
| | 17 | 86.5 15.3 18. | 13.8 | 400. |
| | 18 | 7.8 5.3 7.5 | .2 | 9. |
| +--------+------------------+-----------+-----------+
| |19 to 22| 219. 8.5 6.5 | 7. | 205. |
| | | 183. 8.5 6.5 | 5.8 | 170. |
| +--------+------------------+-----------+-----------+
| | 53 | 19.8 11.6 15.1 | 2. | 105. |
| | 55 | | | |
| | 56 | 24.6 13. 8.2 | 1.5 | 43. |
| | 57 | 19.5 18.5 6.6 | 1.3 | 28.5 |
+-----------+--------+------------------+-----------+-----------+
| BATTERY | 54 | 15. 10.5 11.5 | 1. | 37.5 |
| LOCKER. | | | | |
+-----------+--------+------------------+-----------+-----------+
|IN PLACE ON| 5 | 21. 16.5 7.5 | 1.5 | 80. |
| SPARS.| | | | |
|” ” ” DECK.| 9 | 52. 18.5 18.5 | 10.4 | 155. |
+-----------+--------+------------------+-----------+-----------+
|SEE | 6 | 9.8 9.7 6.8 | .4 | 10. |
|REGULATIONS| 7 | 12.2 10.2 5.2 | .4 | 11. |
| FOR SAME. | 8 | 8.2 14.2 17.5 | 1.2 | 25. |
+-----------+--------+------------------+-----------+-----------+
+===========+========================++=========================+
| | BOAT‘S OUTFIT ||SHIP‘S AND BOAT‘S OUTFIT.|
| |------+-------+---------++------+-------+----------+
| WHERE |Number| Total | || | Total | |
| STOWED. | of |approx.|Aggregate||Number|approx.| Aggregate|
| | boxes|cubical| weight || of |cubical| Weight |
| | | space | || Boxes| space | |
+-----------+------+-------+---------++------+-------+----------+
| | |Cu. ft.| Lbs. || |Cu. ft.| Lbs. |
|GUN-COTTON | 12 | 16.8 | 864. || 24 | 33.6 | 1728. |
| MAGAZINE. | 2 | 3.6 | 132. || 2 | 3.6 | 132. |
+-----------+------+-------+---------++------+-------+----------+
| | | | || 1 | 2.6 | 146. |
| | 1 | 2.8 | 92. || 1 | 2.8 | 92. |
| | 1 | 1.9 | 48. || 1 | 1.9 | 48. |
| | | | || 1 | 2.5 | 67. |
| | | | || 2 | 8. | 444. |
| | 2 | 14.8 | 460. || 2 | 14.8 | 460. |
| | 1 | 1.3 | 54. || 1 | 1.3 | 54. |
| TORPEDO | 1 | 2.6 | 68. || 1 | 2.6 | 68. |
|STOREROOM. | 1 | 1.6 | 30. || 1 | 1.6 | 30. |
| | 1 | 13.8 | 400. || 1 | 13.8 | 400. |
| | 1 | .2 | 9. || 1 | .2 | 9. |
| +------+-------+---------++------+-------+----------+
| | 2 | 14. | 410. || 2 | 14. | 410. |
| | 2 | 11.6 | 340. || 2 | 11.6 | 340. |
| +------+-------+---------++------+-------+----------+
| | 1 | 2. | 105. || 1 | 4. | 172. |
| | 1 | | || 1 | | |
| | 1 | 1.5 | 43. || 1 | 1.5 | 43. |
| | 1 | 1.3 | 28.5 || 1 | 1.3 | 28.5 |
+-----------+------+-------+---------++------+-------+----------+
| BATTERY | 1 | 1. | 36.5 || 1 | 1.9 | 70.5 |
| LOCKER. | | | || | | |
+-----------+------+-------+---------++------+-------+----------+
|IN PLACE ON| | | || 1 | 1.5 | 80. |
| SPARS.| | | || | | |
|” ” ” DECK.| | | || 1 | 10.4 | 155. |
+-----------+------+-------+---------++------+-------+----------+
|SEE | 1 | .4 | 10. || 1 | .7 | 20. |
|REGULATIONS| 1 | .4 | 11. || 1 | .4 | 11. |
| FOR SAME. | 1 | 1.2 | 25. || 1 | 2.2 | 49. |
+-----------+------+-------+---------++------+-------+----------+
INDEX.
After guy—ship‘s torpedo spar, 16
Alkaline solution, 45
Amount of water in wet gun-cotton, 44
Apparatus for drying gun-cotton, 13, 47, 48, 49
Articles for testing gun-cotton. (See Chemical box).
” list of in outfit, 52
” of torpedo outfit supplied at Navy Yard, 15, 56
” ” ” ” ” from Torpedo Station, 14, 52
” spare, 1, 14
Bands, spar, 8, 53
Batteries, firing. (See Firing-batteries).
Battery-cell, description, 27
” cells, spare, 27, 55
” locker, 51
” tester, 28, 55
Blocks, detonator, 11, 53
” primer, dry, 12, 39, 40, 41, 49, 53
Boat, firing-batteries. (See Firing-batteries).
” fittings, Pattern B, 8, 9, 10, 54, 55
” spar. (See Spar).
” to test the circuit from, 21
” wire-box, 7, 54
Bow-fittings, 8, 54
Box, chemical, 13, 54
” gunpowder fuzes and igniters, 12, 53
” reel, 6, 52
” stuffing, 3
” supply, 8, 52
” torpedo packing, 39
” wire, boats, 7, 54
” ” ships, 6, 7, 53
Butts, secondary spar, 5, 54
Cable, insulated. (See Reel box).
Caps, secondary spar, 5, 54
” ” ” rivets for, 54
” water. (See Stuffing-boxes).
Care and management of firing-batteries, 29
” of gun-cotton and detonators, 41
Case, primer. (See Primer-case).
Cell, battery, 27
Cells, battery, spare, 27, 55
Charge, detonator, 10, 42
” primer, dry. (See Primer charge).
Calcium, chloride. (See Chloride of calcium).
Chemical box, 13, 54
Chloride of calcium, 47
” ” ” how distinguished from chloride of lime, 47
” ” ” test of, for bleaching properties, 47
” ” ” to be used instead of chloride of lime, 47
” ” lime. (See Chloride of calcium).
Circuit-closer, Pattern B, description, 4
” ” ” ” how attached, 4, 22
” ” ” ” test, 22, 23
” ” ” ” necessary to be water-tight, 23
” ” ” ” number issued, 4, 56
” ” ” ” safety-pin to be in before priming, 23
” ” ” ” to be tested before priming, 23
” ” safety-pins, spare, 53
” ” spring, spare, 53
” ” weight of, 5
Circuit testing, from ships, 20
” to test the, from boats, 21
Clamps, spar, 10, 54
Cloth, emery, 52
Commanding officer of vessel to be furnished with plan of wires, 52
Condition of firing-batteries, how to test, 28, 29
Connection to terminal, machine, or battery not to be made
until, 20, 21
Contact, fire on, when using circuit-closer, Pattern B, 24
” spar leading-wires, Pattern B. (See Wires).
” torpedo. (See Torpedo).
Continuity of wires, testing, 32, 38
Crutch, swivel, 8, 54
Cutting plyers, 52
Depth. (See Immersion).
Detonator, 10, 41, 42, 53
” blocks, 10, 53
” bridge, resistance of, 11
” care of, 41
” charge, 11, 42
” dummy, 12, 53
” packing and stowage, 10, 42
” splice-sample, 53
” splicing on, 18
” testing, manner of, 17
” when tested, to be put in safe place, 17
Diaphragms, rubber, 56
Distance, proper, for contact torpedo before firing, 21
” ” ” exercise ” ” ” 22
” ” ” service ” ” ” 21
Drier, steam, 13, 46, 56
Dry primers. (See Primer).
Drying apparatus, gun-cotton, 13, 47, 48, 49
” gun-cotton, rules for, 45
Dummy detonators, 12, 53
” gunpowder fuze, 53
Dynamo-electric machine, pattern A, 32, 52
” ” ” ” C, 36, 53
Earth-plates, 52
Electric switches, 15, 56
” ” and permanent wires, use of, 25
” ” not issued with permanent firing apparatus, 15
” ” ” to be used as firing keys, 26
Emery cloth, 52
Exercise torpedo. (See Torpedo).
Fasteners, paper, 53
Fire at will, contact torpedoes, 24
” on contact, contact torpedoes, 24
” torpedoes using A machine and firing-key, 21
” ” ” C ” , 21
” ” ” battery and hand-firing key, 21
Firing-batteries, 27
” ” boats, 28, 55
” ” how to test condition of, 28, 30
” ” management and care of, 29
” ” no connection to be made with until, 20, 21
” ” not to be used to test the circuit, 21
” ” number furnished, 27
” ” ships, 28, 55
Firing-key, D. E. machine, pattern A, 34, 52
” ” ” ” ” ” to test, 36
Fittings, boats. (See Boat-fittings).
” bow, 8
” heel, ship‘s torpedo spar, 16
” ” ” ” ” substitute for, 16
” ship‘s spar, 16, 56
Forward guy, ship‘s torpedo spar, how fitted, 16
Fuze bridges, spare, 55
” gunpowder, dummy, 53
” ” splicing on, 25
Fuzes, gunpowder, 12, 53
Fuzing torpedoes. (See Torpedo).
Glass jars for dry primers, 12, 41, 53
Gun-cotton, amount in torpedo outfit, 40
” ” ” of water in when wet, 44
” ” apparatus for drying, 13, 57, 48, 49
” ” articles for testing. (See Chemical box).
” ” care of, 41
” ” dry, packing and stowage of, 39
” ” inspection of, 42
” ” ” ” precautions to be taken, 44
” ” magazine, 41
” ” miscellaneous data, 49
” ” primers. (See Primers).
” ” rules for drying, 45
” ” test of. (See Inspection of gun-cotton).
” ” removed in priming, where placed, 17, 22
” ” wet, packing and stowage of, 39
Gunpowder fuze, dummy, 53
” ” splicing on, 25
” fuzes, 12, 53
” igniters, 11, 53
” torpedoes, improvised, 24
Guy, after, ship‘s torpedo spar, 16
” forward, ” ” ” how fitted, 16
Hand-firing key, 31, 55
Heel fittings, ship‘s torpedo spar, description, 16
” ” ” ” ” substitute for, 16
Hemp twine, 52
Horizontal distance. (See Distance).
Igniters, gunpowder, 12, 53
Immersion, proper for the exercise torpedo, 22
” ” ” ” service torpedo, 21
” ” ” ” contact torpedo, 21
Improvised torpedoes, gunpowder, 24
Inspection of gun-cotton, 42
” ” ” precautions to be taken, 44
Inspectors of ordnance at Navy Yard, duties of, 51
Instructions, Torpedo, copies of, 56
Insulated cable. (See Reel box).
Insulating splices, 38
Insulation of wires, 37
” ” ” not to be damaged, 37
” ” ” testing the, 32
Jars, glass, for dry primers, 12, 41, 53
Key for ship‘s secondary spar, 5, 53
” hand-firing, 31, 55
Knives, 3
Lead-covered wires, 14
Leading-wires. (See Wires).
Lift, topping, ship‘s torpedo spar, how fitted, 16
Lines, reeving, 20, 53
” ” weights, 20, 53
Locker, battery, 51
Machine connecting wires, 6, 7, 52, 53, 54
” dynamo-electric, pattern A, 32, 52
” ” ” ” C, 36,53
” no connection to be made with until torpedo is
immersed, 20, 21
Magazine, gun-cotton, 41
Magneto, testing, 31, 32, 55
Management and care of firing-batteries, 29
Monkey wrench, 52
Navy Yard, articles of torpedo outfit supplied at, 14, 56
” ” Inspectors of ordnance at, duties of, 51
No connection to be made to terminal, battery, or machine
until, 20, 21
Officer commanding vessel to be furnished with plan of wires, 52
Okonite tape, 18, 52
Open-end wrench, 52
Outfit, spar-torpedo, amount of gun-cotton in, 40
” ” articles of, invoice number of boxes
containing, 57
” ” ” ” list of, 52
” ” ” ” place of stowage, 57
” ” ” ” spaced occupied when boxed, 57
” ” ” ” supplied at Navy Yards, 14, 56
” ” ” ” from Torpedo Station, 48
” ” ” ” weight of when boxed, 57
” ” how designated, 1
” ” includes, 1
Packing, spherical rubber, 3, 53, 56
Paper fasteners, 53
Permanent wires, 14, 56
” ” plan to be furnished to, 52
” ” use of, 25
Pins, safety, for circuit-closer, spare, 53
” ” ” ” ” to be in before priming, 23
” torpedo, 5, 55
” ” spare, 55
Plate, testing and firing, 53, 56
Plates, earth, 52
Plyers, cutting, 52
Precautions to be taken in inspection of gun-cotton, 44
Preparation of contact torpedo, 22
” ” exercise ” pattern D, 22
” ” service ” ” ”, 17
Primer blocks, 12, 39, 40, 41, 53
” case, description of, 2
” charge, 40, 41
” not to remain long in exercise torpedo, 22
” dry gun-cotton, care of, 41
” ” ” ” how packed and stowed, 12, 39, 41
” ” ” ” inspection of, 42
” ” ” ” number furnished, 41, 42
” ” ” ” precautions to be observed with, 42, 44
” ” ” ” testing. (See Inspection of gun-cotton).
” wet ” ” how packed, 39
Priming the exercise torpedo, 22
” ” service torpedo, 17
Priming, wet gun-cotton removed in, where stowed, 17, 22
Rectifier, 19, 52
Reel box, 6, 52
Reeving-lines, 20, 53
” line weights, 20, 53
Resistance of detonator bridge, 11
Rivets for secondary spar butts, 54
” ” ” ” caps, 54
Rubber diaphragms, 4, 56
” packing, spherical, 3, 53, 56
” tubing, 38, 52
” washers, 2, 56
Rules for drying gun-cotton, 45
Safety-break of contact spar leading-wires, 6
” ” to be kept open until, 24
Sample splice, 52
” ” detonator, 53
Safety-pin circuit-closer, spare, 53
” ” ” ” to be in before priming, 23
Screw-driver, 52
” tap, 53
Screws for boat spar, pattern A, 53
Secondary spar. (See Spar).
Service torpedo. (See Torpedo).
Shipping contact torpedo, safety-pin to be in before, 23
” secondary spar. (See Spar).
” torpedo. (See Torpedo).
Ship‘s firing-batteries. (See Firing-batteries).
” testing circuit from, 20
” torpedo spar. (See Spar).
” wire-box, 6, 53
Solution, alkaline, 45
Spar-bands, 8, 53
” boat, pattern A, 10, 55
” ” ” ” screws for, 53
” ” ” ” to be taken apart when not in use, 10
” clamps, 10, 54
” leading-wires. (See Wires).
” secondary, butts, 5, 54
” ” ” rivets, 54
” ” caps, 5, 54
” ” ” rivets, 54
” ” keys, 5, 54
” ” pattern A, description, 5
” ” ” ” difference between boats and ships, 5
” ” ” ” how packed for boats, 5, 54
” ” ” ” ” ” ” ships, 5, 54
” ” ” ” number supplied, 5
” ” pattern A, shipping, 19
” secondary, pattern A, toggles, 5, 53
” ship‘s, description, 15
” ” fittings, 16, 56
” ” number supplied, 15
” torpedo. (See Torpedo).
Spare articles, 1, 14
Spherical rubber packing, 56
Spindle for torpedo. (See Torpedo).
Splice wire, insulating of, 38
” ” sample, 52
” detonator, sample, 53
” towing strain on, how to prevent, 19
Splicing on detonator, 18
” ” gunpowder fuze, 25
” wires, 37
Spring for circuit-closer, spare, 53
Steam-drier, 13, 46, 56
Storeroom, torpedo, 51
Strain, towing on splices, how to prevent, 19
Stuffing-boxes, 3
Supply-box, 8, 52
Switches, electric. (See Electric switches).
” ” and permanent wires, use of, 25
Swivel-crutch, 8, 54
Table showing weight, space, and place of stowage of articles, 57
Tape, okonite, 18, 52
Terminals, 15
” connection with not to be made until, 20
Test-circuit through circuit-closer, pattern B, how to, 22, 23
” condition of firing-batteries, how to, 28, 30
Tester, battery, 28, 55
Test, gun-cotton. (See Inspection of gun-cotton).
Testing and firing-plate, 53, 56
” circuit-closer, pattern B, 22
” circuit from boat, 21
” ” ” ship, 20
” continuity of wires, 32, 38
” detonator circuit in contact torpedoes, 24
” ” manner of, 17
” ” when, put in a safe place, 17
” gun-cotton, articles for. (See Chemical box).
” insulation of wires, 32
” magneto, 31, 32, 55
Toggles, secondary spar, 5, 53
Topping lift, ship‘s spar, 16
Torpedo, contact, circuit-closer to be tested before priming, 22
” ” fuzing, 23
” ” no connection to be made until, 21
” ” preparation of, 22
” ” priming, 23
” ” proper distance and immersion, 21
” ” shipping, 23
” ” safety-pin to be in, 23
” ” splicing on detonator for, 23
” ” testing circuit, 24
” ” to fire at will, 24
” ” ” ” on contact, 24
” ” spar leading-wires, pattern B, 7, 22, 23, 24
” exercise, pattern D, description, 2
” ” ” ” fuzing, 22
” ” ” ” necessary to be closed
water-tight, 3, 22
” ” ” ” no connection to be made until, 20, 21
” ” ” ” number issued, 2, 40
” ” ” ” outfit of, 40, 55
” ” ” ” packed, 39
” ” ” ” preparation of, 22
” ” ” ” primer not to remain in long, 22
” ” ” ” priming, 22
” ” ” ” shipping, 22
” ” ” ” spindle packed, 5, 55
” ” ” ” splicing detonator on, 22
” ” ” ” testing, 22
” ” ” ” weight, empty, 3
” ” ” ” of charge, 3
” ” ” ” when issued filled with wet
gun-cotton, 3, 39, 44
” ” proper distance and immersion, 22
” Instructions, copies of, 56
” outfit. (See Outfit).
” no connection to terminal, battery, or machine to be
made until, 20, 21
” packing boxes, 39
” pins. (See Pins).
” service and contact, proper distance and immersion, 21
” ” pattern D, conversion of to contact torpedo, 2, 22
” ” ” ” description, 1
” ” ” ” firing, 21
” ” ” ” fuzing, 19
” ” ” ” necessary to be closed water-tight, 2
” ” ” ” no connection to be made until, 20, 21
” ” ” ” not advisable to prime long before
using, 17
” ” ” ” number issued, 1, 40
” ” ” ” outfit, 40, 55
” ” ” ” preparation of, 17
” ” ” ” primer-case, 2
” ” ” ” priming, 17
” ” ” ” shipping, 19
” ” ” ” splicing detonator on, 18
” ” ” ” spindle, 2, 55
” ” ” ” testing, 20, 21
” ” ” ” weight, empty, 2
” ” ” ” of charge 2
” ” ” ” when issued filled with wet
gun-cotton, 2, 39, 44
” spars, ship‘s, 15
” ” ” number of, 15
Torpedo Station, articles supplied from, 52
” store-room, 51
Torpedoes, firing, using A machine and firing-key, 21
” ” ” C ” 21
” ” ” battery and hand-firing key, 21
” gunpowder improvised, 24
” how named, 1
” ” packed and marked, 39
” ” to be stowed on board ship, 39
” intended use of, 1
” when received on board, what to do with, 39
Towing strain on splices, how to prevent, 19
Tubing, rubber, 38, 52
Twine, hemp, 52
Use of permanent wires and electrical switches, 25
” ” leading-wires with circuit-closer, pattern B, 22, 23, 24
Washers, rubber, 2, 56
Water, amount in wet gun-cotton, 44
” caps. (See Stuffing-Boxes).
Weights, reeving-line, 20, 53
Wet gun-cotton, amount of water in, 44
” ” ” packing and stowage of, 39
” ” ” removed in priming, where placed, 17, 22
” primers. (See Primers).
Will, to fire at, contact torpedo, using circuit-closer,
pattern B, 24
Wire-box, boat‘s, 7, 54
” ” ship‘s, 6, 7, 53
Wire, continuity of, testing the, 32, 38
” insulation of, 37
” ” ” not to be damaged, 37
” ” ” testing the, 32
” splice, insulating, 38
Wires, contact spar leading, pattern B, 7, 22, 23, 24
” lead-covered, 14
” machine connecting, 6, 7, 52, 53, 54
” permanent. (See Permanent).
” ” plan of, to be furnished to, 52
” spar leading, how marked, 7
” ” ” boats, 7
” ” ” ” to be led through spar, 20
Wires, spar leading, never to be connected to terminals,
battery, or machine until, 20, 21
” ” ” ship‘s, 6, 54
” ” ” ” to be stopped to spar, 19
” splicing, 37
Wrench, monkey, 52
Wrenches open-end, 52
PLATES.
=PLATE I.=
SERVICE TORPEDO.—PATTERN D.
_A_ barrel.
_B_ lower head.
_C_ upper ”
_g_, _h_ splices between leading-wires and detonator-wires.
_K_ handle.
_l_ lugs for handle.
_k_ ” ” spindle.
_i_, _i_ screw-holes for attaching circuit-closer.
_n_ screw-rib for screw-cover.
_r_ projection on handle shipping into spindle.
_t_ screw-bolts securing spindle to lugs.
_H_ spindle.
_L_ spar leading-wires.
_M_ water-cap.
_P_ primer-case.
_O_ screw-cover.
_w_ rubber washer.
_G_ spherical rubber packing.
_D_, _D_ dry gun-cotton primer.
_x_ detonator.
_Y_ wet charge.
=PLATE II.=
EXERCISE TORPEDO.—PATTERN D.
_c_ case.
_d_ lower loop.
_e_, _e_ loops for transportation thumb-screw and
for spindle.
_f_ throw-back hinge with thumb-screw.
_H_ spindle.
_O_ cover.
_w_ rubber washer.
_M_ water-cap.
_G_ spherical rubber packing.
_Y_, _Y_, _Y_, _Y_ wet charge.
_D_, _D_, _D_, _D_ dry primer.
_x_ detonator.
_L_ spar leading-wires.
_g_, _h_ splices between leading-wires and
detonator-wires.
=PLATE III.=
CIRCUIT-CLOSER.—PATTERN B.—CONTACT TORPEDO.
_A_ hollow brass casting.
_M_ water-cap.
_G_ spherical rubber packing.
_O_, _O_ feet for attaching circuit-closer to service
torpedo, Pattern D.
_B_ inner brass plunger.
_C_ spiral spring.
_N_ ebonite collar.
_I_, _I_ binding-posts.
_E_ contact-springs.
_t_ screw-cover.
_s_, _s_ contact arms.
_K_ outer plunger.
_l_ safety-pin.
_V_ rubber diaphragm.
_k_ friction-plate.
=PLATE IV.=
SECONDARY SPARS.
FIG. 1, SHIP‘S.—PATTERN A.
_A_ main spar.
_B_ secondary spar.
_a_, _a_ spar-bands.
_b_ key-way.
_c_ key.
_l_ hole for torpedo-pin.
_m_ torpedo-pin.
FIG. 2, BOAT‘S.—PATTERN A.
_R_ main spar.
_H_ secondary spar.
_i_ butt.
_k_ cap.
_g_ toggle.
_l_ hole for torpedo-pin.
_m_ torpedo-pin.
=PLATE V.=
CONTACT SPAR LEADING-WIRES.—PATTERN B.
_B_ battery.
_C_ contact torpedo.
_x_ circuit-closer.
_D_ contact spar leading-wires.
_H_ hand-firing key.
_S_ safety-break.
=PLATE VI.=
SPAR-TORPEDO BOAT-FITTINGS.—PATTERN B.
_S_ heel-rest.
_H_ swivel-crutch.
_R_ cross-beam.
_D_ ” bearing, riveted to cross-beam and bolted
through rail.
_E_ elevating-arm.
_m_ plate washer.
_n_ nut on end of securing rod.
_G_ guide-ring.
_K_ gear on elevating-arm.
_M_ worm.
_N_ worm-shaft, forward length.
_O_ ” ” after ”
_X_ hook-coupling.
_P_ elevating-wheel.
_Q_ clutch.
_L_ detaching-lever.
_T_ torpedo.
_A_ main spar.
_B_ secondary spar.
=PLATE VII.=
JUNCTION OF TUBES FORMING BOAT‘S SPAR.—PATTERN A.
_A_ large tube.
_B_ small tube.
_c_, _c_ rings.
_d_ shoulder.
_e_ screw-holes.
_f_ feather.
_g_ score.
=PLATE VIII.=
FIG. 1, DETONATOR.
_A_ copper case.
_B_ plug.
_c_, _c_ detonator-legs.
_D_ bridge.
_F_ gun-cotton priming.
_H_ fulminate of mercury.
FIG. 2, DETONATOR BLOCK.
_A_ block.
_B_ ” cover.
_C_, _C_ detonators.
_D_, _D_ tin box.
_Fig. 1._]
=PLATE IX.=
FIG. 1, PERMANENT WIRES.
_A_, _A_ electric switches (on bulwarks under bridge).
_B_, _B_ forward terminals.
_C_, _C_ after ”
_D_, _D_ forward permanent wires.
_E_, _E_ after ” ”
_G_, _G_ permanent wires leading from bridge to lower
binding-posts of electric switches.
_H_, _H_ wires leading from bridge to common-return
terminals, below switches.
_K_ terminal on bridge for wires _H_, _H_.
_L_, _L_ ” ” ” ” ” _G_, _G_.
_X_ firing-battery connected to terminals on bridge.
FIG. 2, CONNECTIONS WITH FIRING-KEY OF “A” MACHINE.
_B_, _B_ terminals of firing-key.
_T_, _T_ ” ” ”
Key “_T_” test key.
Key “_F_” firing key.
_M_, _M_ wires to terminals _L_, _L_
on bridge. (Fig. 1.)
_N_ wire to terminal _K_ on bridge (common return).
(Fig. 1.)
_O_, _O_ machine-connecting wires.
FIG. 3, CONNECTIONS WITH FIRING-BATTERY.
_B_, _B_ terminals of battery.
_M_, _M_ wires to terminals _L_, _L_
on bridge. (Fig. 1.)
_N_ wire to terminal _K_ on bridge (common return).
(Fig. 1.)
_H_ hand-firing key.
_Fig. 2._]
=PLATE X.=
FIG. 1, ELECTRIC SWITCH.
_A_ permanent wire to forward torpedo.
_B_ ” ” ” after ”
_C_, _C_ ” ” common return.
_D_ wire to battery or firing-key of machine.
_E_ commutator of switch.
FIG. 2, TERMINAL.
_H_ binding-screw.
_I_ permanent wire.
_w_ wire temporarily connected.
=PLATE XI.=
HEEL FITTINGS FOR SHIP‘S SPAR.
_a_ ship‘s spar.
_b_ thrust-plate (30″ diameter).
_c_ eye-bolt through thrust-plate and ship‘s side.
_d_ heel-bolt.
_Fig. 2._]
=PLATE XII.=
SHIP’S SPAR FITTINGS.
_a_ ship’s spar.
_b_ topping lift.
_c_ forward guy.
_d_ after ”
_e_ span for topping lift (16′ long).
_f_ ” ” forward guy (16′ long).
_x_, _x_, _x_, _x_ bands on spar (5′ apart).
=PLATE XIII.=
BATTERY CELL.
_a_ okonite jar.
_b_, _b_ zinc cylinder.
_c_ platinum plate.
_d_ muslin bag filled with crushed carbon.
_e_ ebonite disc.
_f_ ” plug.
_g_ sal-ammoniac solution.
_h_ positive terminal.
_i_ negative ”
_k_ rubber cover.
_r_ rubber ring.
=PLATE XIV.=
BATTERY TESTER.
_a_, _a_ battery terminals.
_b_ ” tester.
_c_ fuze-bridge in tester.
=PLATE XV.=
FIG. 1, HAND-FIRING KEY.—PATTERN B.
_a_, _a_ hickory pieces.
_c_, _c_ contact studs.
_L_, _L_ leading-wires.
_d_ rubber cot.
_e_ safety-pin with hole for laniard.
_f_ eye-bolt for laniard.
FIG. 2, DIAGRAM SHOWING HAND-FIRING KEY IN CIRCUIT.
_B_ battery.
_H_ hand-firing key.
_w_, _w_ leading-wires.
=PLATE XVI.=
FIG. 1, “A” MACHINE AND FIRING-KEY CONNECTED.
_A_ “A” machine.
_C_ firing-key.
_B_, _B_ terminals of firing-key.
_T_, _T_ ” ” ”
Key “T” test key.
” “F” firing-key.
_O_ machine-connecting wires.
_w_, _w_ wires to torpedo.
FIG. 2, “C” MACHINE CONNECTED.
_D_ “C” machine.
_C_ firing-key (in the machine).
Key “T” test key.
” “F” firing-key.
_w_, _w_ wires to torpedo.
=PLATE XVII.=
FIG. 1, firing-key, short-circuit.
” 2, ” testing circuit.
” 3, ” firing-circuit.
_O_, _O_ machine-connecting wires.
_w_, _w_ wires to torpedo.
_B_, _B_ terminals of firing-key.
_T_, _T_ ” ” ”
Key “T” test key.
Key “F” firing-key.
_Fig. 1._]
=PLATE XVIII.=
STEAM-DRIER.
_Fig. 1._]
Comments
Log in to leave a comment.
Spar-torpedo instructions for the United States NavyChapter V: Appendix
0%21 min left in chapter