Introductory note 91
General remarks, inspection and inspectors 91
General instructions 94 1–13
Sub-foundation work general 96 14
curbing 97 15
rough grading 98 16
fine grading 98 17
incidental work 98 18
concrete foundation 98 19
quality of materials 98 20
storing materials 99 21
proportioning 99 22
mixing concrete 100 23
placing concrete 100 24–25
Old paving stone foundation 101 26
Broken stone foundation 101 27
Sheet asphalt pavement 101 28
inspecting at paving plant 102 29–30
sand 102 31–33
refined asphalt and flux 103 34–36
asphaltic cement 103 37
ratio, sand and cement 104 38
mixing 104 39
records 104 40
Inspecting on the street 105 41–42
temperature of mixture 105 43
preparing street surface 105 44
laying binder-course 106 45
laying surface-course 106 46–50
Asphalt block pavement 107 51–52
Granite block pavement 108 53
blocks 108 54
sand cushion 108 55
setting the block 108 56
ramming the blocks 109 57
filling joints 110 58
Brick pavement 110
inspecting the brick 110 60
sand cushion 111 61
setting brick 111 62
rolling 111 63
filling the joints 112 64–65
Wood-block pavement 112
inspection of blocks 112 67
mortar bed 112 68
setting blocks 113 69
filling the joints 113 70
Bituminous concrete pavement 113 71–72
Hydraulic concrete pavement 113 73
foundation 113 74
surface-course 114 75–77
expansion joints 114 78
care of work 114 79
Concrete combined curb and gutter 114
concrete 115 81
removing forms 115 82
corner protection 115 83
patching 116 84
Hydraulic concrete sidewalk 116
materials 116 86
drainage 116 87
two-course work 116 88
finishing surface 116 89–90