Chapter II: Section 39: 17. Joining Tunnel Struts by Halving 48
18. Round Timber Post and Cap Bearing 48
19. Ceiling Strutting for Tunnel Roofs 49
20. Ceiling Strutting with Side Post Supports 49
21. Sill, Side Post and Cap Cross Frame Strutting 49
22. Reinforced Cross Frame Strutting for Treacherous Materials 49
23. Longitudinal Poling-Board System of Roof Strutting 50
24. Transverse Poling-Board System of Roof Strutting 50
25. Shaft with Single Transverse Strutting 52
26. Rectangular Frame Strutting for Shafts 53
27. Reinforced Rectangular Frame Strutting for Shafts in
Treacherous Materials 53
28. Strutting of Timber Posts and Railway Rail Caps 56
29. Strutting Made Entirely of Railway Rails 56
30. Rziha’s Combined Strutting and Centering of Cast Iron 57
31. Cast-Iron Segment of Rziha’s Strutting and Centering 57
32. Cast-Iron Segmental Strutting for Shafts 58
33. Platform Car for Tunnel Work 59
34. Iron Dump-Car for Tunnel Work 60
35. Wooden Dump-Car for Tunnel Work 60
36. Box-Car for Tunnel Work 61
37. Elevator Car for Tunnel Shafts 65
38. Ground Mold for Constructing Tunnel Invert Masonry 67
39. Combined Ground Mold and Leading Frame for Invert and Side
Wall Masonry 67
40. Leading Frame for Constructing Side Wall Masonry 68
41. Plank Center for Constructing the Roof Arch 69
42. Trussed Center for Constructing the Roof Arch 70
43 and 44. A Typical Form of Timber Lining for Tunnels 73
45. Diagram Showing Forms adopted for Side-Wall Foundations 76
46 and 47. Transverse Sections of Tunnels Showing Methods for
Increasing the Thickness of the Lining at Different Points 79
48. Refuge Niche in St. Gothard Tunnel 81
49. East Portal of Hoosac Tunnel 82
50, 51 and 52. Arrangement of Drill Holes in the Heading of
Turchino Tunnel 91
53 and 54. Arrangement of Drill Holes in the Heading of the Fort
George Tunnel 91
55. Diagram Showing Sequence of Excavations in Drift Method of
Tunneling Rock 102
56. Sketches Showing Sequence of Work in Excavating and Lining
the Simplon Tunnel 111
57. General Details of the Brandt Rotary Drills Employed at the
Simplon Tunnel 112
58. Sequence of Excavation in the Murray Hill Tunnel 124
59. Traveling Platform for the Excavation of the Upper Side of
the Murray Hill Tunnel 125
60. Timbering Used in the Murray Hill Tunnel 126
61. Diagram Showing Sequence of Excavation in Heading Method of
Tunneling Rock 132
62. Method of Strutting Roof, St. Gothard Tunnel 135
63. Sketch Showing Arrangement of Tracks, St. Gothard Tunnel 135
64. Arrangement of Drill Holes in the Fort George Tunnel 137
65. Longitudinal Section of the Heading and Bench Excavation at
the Fort George Tunnel 137
66. Diagram Showing the Arrangement of Drill Holes in the
Heading and Bench of the Gallitsin Tunnel 140
67. Diagram Showing Modification of the Heading and Bench Method 140
68 and 68A. Diagrams Showing Sequence of Excavation in the
Belgian Method 145
69. Sketch Showing Radial Roof Strutting, Belgian Method 147
70. Sketch Showing Roof Arch Center, Belgian Method 147
71. Sketch Showing Method of Underpinning Roof Arch with the
Side Wall Masonry 149
72. Longitudinal Section Showing Construction by the Belgian
Method 149
73. Diagram Showing Sequence of Excavation in Modified Belgian
Method 152
74. Sketch Showing Failure of Roof Arch by Opening at Crown 153
75. Sketch Showing Methods of Repairing Roof Arch Failures 154
76. Diagrams Showing Sequence of Excavation in German Method of
Tunneling 155
77. Diagram Showing Sequence of Excavation in Water Bearing
Material, German Method 156
78. Sketch Showing Work of Excavating and Timbering Drifts and
Headings 157
79. Sketch Showing Method of Roof Strutting 157
80. Sketch Showing Roof Arch Centers and Arch Construction 158
81. Sketch Showing Method of Excavating and Strutting Baltimore
Belt Line Tunnel 162
82. Roof Arch Construction with Timber Centers, Baltimore Belt
Line Tunnel 163
83. Roof Arch Construction with Iron Centers, Baltimore Belt
Line Tunnel 164
84. Diagram Showing Sequence of Excavation in English Method of
Tunneling 167
85. Sketches Showing Construction of Strutting, English Method 168
86 and 87. Sketches of Typical Timber Roof-Arch Centers, English
Method 169
88. Sequence of Excavation in the American Method 172
89. Strutting the Heading in the American Method 172
90. Temporary Timbering of the Roof in the American Method 173
91. Showing Crown Bars Supported by Segmental Arches 173
92. Transversal and Longitudinal Section of a Tunnel Excavated
and Strutted According to the American Method 174
93 and 94. Diagrams Showing Sequence of Excavation in Austrian
Method of Tunneling 177
95, 96 and 97. Sketches Showing Construction of Strutting,
Austrian Method 178
98. Sketch Showing Manner of Constructing the Lining Masonry,
Austrian Method 179
99. Diagram Showing Sequence of Excavation in Italian Method of
Tunneling 183
100. Sketch Showing Strutting for Lower Part of Section 183
101 and 101A. Sketches Showing Construction of Centers, Italian
Method 184
102. Sketch Showing Invert and Foundation Masonry, Italian Method. 185
103. Sketch Showing Longitudinal Section of a Tunnel under
Construction, Italian Method 186
104. Sketch Showing Sequence of Excavation, Stazza Tunnel 186
105. Sketch Showing Method of Strutting First Drift, Stazza
Tunnel 187
106 and 107. Sketches Showing Temporary Strutting Arch
Construction, Stazza Tunnel 187
108. Sketch Showing Preliminary Drainage Galleries, Quicksand
Method 190
109. Sketch Showing Construction of Roof Strutting, Quicksand
Method 190
110. Sketch Showing Construction of Masonry Lining, Quicksand
Method 191
111. Sketch Showing Pilot Method of Tunneling 193
112. Diagram Showing Sequence of Construction in Open-Cut Tunnels 197
113. Sketch Showing Method of Timbering Open-Cut Tunnels, Double
Parallel Trench Method 198
114. Side-Wall Foundation Construction Open-Cut Tunnels 198
115. Wide-Arch Section, Boston Subway 204
116. Double-Barrel Section, Boston Subway 205
117. Four-Track Rectangular Section, Boston Subway 206
118. Section Showing Slice Method of Construction, Boston Subway 206
119. Double-Track Section, New York Rapid Transit Railway 212
120. Park Avenue Deep Tunnel Construction, New York Rapid Transit
Railway 214
121. Harlem River Tunnel, New York Rapid Transit Railway 215
122. Sketch Showing Underground Stream, Milwaukee Water-Works
Tunnel 229
123. Sketch Showing Methods of Lining, Milwaukee Water-Works
Tunnel 232
124. Longitudinal Section of Brunel’s Shield, First Thames Tunnel 241
125. First Shield Invented by Barlow 242
126. Second Shield Invented by Barlow 243
127. Shield Suggested by Greathead for the Proposed North and
South Woolwich Subway 245
128. Beach’s Shield Used on Broadway Pneumatic Railway Tunnel 245
129. Shield for City and South London Railway 246
130. Shield for St. Clair River Tunnel 247
131. Shield for Blackwall Tunnel 248
132. Elliptical Shield for Clichy Sewer Tunnel, Paris 249
133. Semi-Elliptical Shield for Clichy Sewer Tunnel 250
134. Roof Shield for Boston Subway 251
135. Transversal and Longitudinal Section of Prelini’s Shield 252
136. Elevation and Section of Hydraulic Jack, East River Gas
Tunnel 260
137. Cast-Iron Lining, St. Clair River Tunnel 262
138. General Elevations and Sections of Shields 270
139. Plan and Elevation of First Bulkhead Wall in South Tube,
Manhattan 273
140. Typical Cross-Sections of One Tube of Pennsylvania Railroad
Tunnel under the Hudson River 278
141. Sections of Cofferdam, Van Buren St. Tunnel, Chicago 283
142. Showing Working Platforms and Piles Sunk in Dredged Channel 286
143. Showing Sheeting-Piles for the Sides of the Caisson and
Trussed Beam for the Roof 287
144. Showing the Caisson with the Working-Chamber 287
145. Showing the Tunnel Constructed within the Caisson 289
146. Showing Sides of the Caisson and Supports for the Roof 290
147. Showing the Roof of the Caisson Formed by the Upper Half of
the Tunnel 291
148. Showing the Tunnel Completed by Building the Lower Half
within the Caisson 292
149. Transversal Section of the Caissons for the Tunnel under the
Seine River 294
150. Showing the Joining of the Caissons at the Pont Mirabeau
Tunnel under the Seine River 295
151. Cross-Sections and Plans of the Detroit River Tunnel 298
152. Tunneling through Caved Material by Heading 306
153. Tunneling through Caved Material by Drifts 307
154 and 155. Filling in Roof Cavity Formed by Falling Material 307
156. Timbering to Prevent Landslides at Portal 308
157. Shortening Tunnel Crushed by Landslide at Portal 308
158. Extending Tunnel through Landslide at Portal 309
159 and 160. Relining Timber-Lined Tunnel 316
161. Relining Timber-Lined Tunnel, Great Northern Ry 317
162. Relining Timber-Lined Tunnel, Great Northern Ry 318
163. Relining Timber-Lined Tunnel, Great Northern Ry 319
164. Construction of Centering Mullan Tunnel 320
165. Centering Mullan Tunnel 321
166. Relining Timber-Lined Tunnel, Norfolk & Western Ry 322
167. Relining Timber-Lined Tunnel, Norfolk & Western Ry 323