Chapter III: Use and Abuse of Cars (7)
Mail train, fast, 317
Managers and investors, relations of, 357
Masonry arch bridges, 76
Massachusetts Railroad Commission and traffic questions, 367
Master Car Builders' Association brake-trials, 200
type of car-coupler, 223
Master car-builder's duties, 158
Master mechanic's work, 157
Master of transportation, duties of, 159, 171
Mexican Central Railway, 56
Mileage balances, reduction of, 273
Miller coupler and buffer, 237
Miller, Ezra, 237
Milling in transit, 175
Model railway service, 375
Mohawk & Hudson passenger-cars, 139
Mont Cenis Tunnel, 63
Moral standard on the railway, improvement in, 384
Mount Washington Railway, 58
Mountain climbing by rack railways, 58
railways, 49
National regulation of railways, 367
Newell, John, 340
New York Elevated Railways, 97
Niagara cantilever bridge, 34, 90
suspension bridge, 81
Nochistongo cut, 56
Operating department of a railway, importance of, 373
Oroya Railway in the Andes, 50, 53
Outram, Benjamin, 345
Paper car-wheels, 145
Passenger advertisement, first, 229
brakeman, 396
burned in wrecks, 225
cars, early, 231;
English and American, 232;
first American, 139;
manufacture of, 252;
Mohawk & Hudson, 139
conductor, 408
fares, comparative rates, 265
profits, 442
rates and commissions, 17
tickets, old, 236
traffic, 442
trains, first, 228;
early American, 230;
making time on, 403
travel, 362;
amount of, 264;
safety of, in England and America, 260;
speed of, 249
Pay-car, trip of the, 309
Pay, increase of, for faithful service, 378
Paymaster's work, 308
Parallel roads, 356
Pensions for railway employees, 378
Pennsylvania Railroad shops at Altoona, 132
maintenance of track, 41
system, 371
Permanent service of a railway, 375
Pile-driver, work of a, 22
Pile foundations for bridges, 68
Plant, H. B., 340
Pneumatic caissons for bridge foundations, 69
interlocking apparatus, 210
Pœtsch method of building foundations for bridge piers, 32
Pooling rates, 184
Pools and competing points, 364
railway, origin and nature of, 364
Pope, Thomas, 33
Portage Bridge, 78
Postal cars, 325
first used, 316
provision against accident in, 338
Postal clerks, accidents to, 338
Postal progress, object lesson in, 312
Postal service, early history, 313
Potter, Thomas J., 412
Poughkeepsie cantilever bridge, 32, 34
Predecessors of the railway, 101
Premiums to section-men, 41
Promotion of employees, 376
Pullman, George M., 239
Palace Car Company, 242
sleeper, first, 241
Purchasing agent's varied duties and experience, 300
Rails, development of, 47
increased weight of, 122
iron, first used, 1, 37
joints for, 37
steel, first introduction, 37
supply and renewal of, 306
weight which they will carry, 121
Railroading fifty years ago, 100
Railways, American, key to the development of, 3;
rolling stock of, 148;
and English, essential differences, 10
amount of capital invested in, 344
and their employees, nature of relations, 374
and democracy, 45
and their customers, 358
beginning of, 345
building, cost of, 43;
example of rapid, 44;
history of, 445
competition of, 174;
with canals, 347
consolidation, 174, 346
council, proposed, 380
division of expenses on, 359
earnings, average net, per mile, 444
earliest, 1;
in America, 103
early systems of management, 346
economic view of, 45
educational institutions, 379
employees, permanent and temporary, 375;
general characteristics of, 423;
moral welfare of, 423;
a typical, 383;
wages of, 448
growth of, 346
income, sources of, 180
influence on the world, 149
mail first carried on, 314
mail service, growth of, 314;
importance of, 323;
needs of, 341;
organization of, 323;
party injury to, 341
management, development of, 150;
in Europe, 184;
organization and division of authority, 151;
results expected from, 184;
special departments of, 372;
stability of, 184;
subdivisions of, 372
men's building in New York, 424
mileage, comparative, of the principal countries, 425;
of the United States, 426
national idea developed by, 348
national regulation, 367
officers' duties and responsibilities, 151
organization analyzed, 185;
complex, 183;
growth of, 371
personnel, importance of, 424
place in the modern industrial system, 344
postal clerks' dangers, 337;
just claims, 343;
need of provision against disability, 339;
work, 334
relations of, to their employees, 357
shop-men, 423
State ownership of, 362
statistics of, 425
systems, 428
the largest single industrial interest, 370
United States, extent of, 43
"wars" between, 361
Randall, Samuel J., 323
Rates and rebates, 173
causes of reduction, 358
combinations and adjustments, 176
forced reductions, 363
how made and regulated, 176
inequalities of, 359
passenger, and commissions, 178
plans for regulating, 362
special, wars over, 177
without a natural standard, 360
Reagan, John H., 368
Reconnoissance, 13
Refrigerator cars, 289
Representation for railway employees, 380
Restriction of railways, tendency to, 369
Ride on a locomotive at night, 188
Righi Railway, 59
Road-bed of a railway, how made, 21
Roadway department of a railway, 154
Roberts, George B., 340
Roebling, John A., 82
Rolling stock, growth of, 448
Routine of the railway mail service, 325
Rutter, J. H., 340
Safety appliances, railway, 191
devices needed, 423
St. Gothard Tunnel and spirals, 63
St. Louis Bridge, 64, 93
Schneider, C. C., 34
Scott, Thomas Alexander, 319, 349
Scrap-heap, value of, 302
Section-master's duties, 421
Section-men's work, 156
Semaphore signals, 203
Shepard, General D. C., 44
Signals and switches, interlocking, 168, 204
automatic block, 215
block system, 168, 213
semaphore, 203
torpedo, 213
Sleeping-car rates, comparative, 266
Sleeping-cars, first experiments, 239
immigrant, 251
Pullman, 239, 242
Smith, Colonel C. Shaler, 34, 88
Snow-sheds and fences, 18
South American mountain-railways, 50
South Carolina Railway, 104
early passenger trains, 231
Special rates, 177, 361
Spoils system, how it works in the railway mail service, 342
Spreading of rails, 220
State ownership of railways, 362
State regulation of railways, 362, 363
Station agent's duties, 411
Station indicators, 259
Station, large, work at, 415
small, work at, 411
Stationery and blanks, quantity used on a railway, 304
Statistics, railway, 425
Steam driver-brake, 192
how distributed to the cylinders, 117
shovel, work of, 21
supply and speed, relations of, 129
Steel bridges, 29
Steel rails, first introduction, 37
Steel truss-bridges, development of, 85
Stephenson, George, 1, 2, 3, 228, 346
Robert, 1, 2, 3, 79, 192
Stock and bonds, relative position, 354
Storekeeper's duties on a railway, 307
Stockton & Darlington passenger train, 228
"Stourbridge Lion," 102
Strikes, evils of, 374
Superintendent, duties of, 274
of machinery, powers and duties, 157
Supply department, 298
importance of, 311
Supplies, aggregate of, on a railway, 299
variety required for a railway, 301
Surveying party, life of, 13
from a rope ladder, 50
Surveys, preliminary, 13
Suspension bridges, 81
Switchbacks and loops, 8;
types of, 9, 10
Switches, interlocking, 420
stub, accidents caused by, 218
Switch-tender's work, 420
Telegraph in railroading, 238
Thompson, William B., 317, 322, 342
Thomson, Frank, 43, 340
Thomson, J. Edgar, 349
Through and local freight, 288
Through lines, growth of, 348
Tickets, cost of, on a railway, 305
coupon, 254
old, 236
sales and reports, 182
Ties and timber supplies, 306
Time, fast, instances of, 404
making, on passenger trains, 403
Time-tables, cost of, 305
earliest American, 235
how made, 160
Torpedo signals, 213
Track, early experiments with, 36, 37
how laid, 36
how maintained and kept in order, 38
inspection on the Pennsylvania Railroad, 41
laid on stone, 36
standards of excellence, 41
Trackmen's duties, 38
organization and officers, 41
Track-walker's duties and trials, 422
Trade centres, advantages of, 360
Traffic, how influenced and secured, 172
manager, duties of, 172
questions and the Massachusetts Railroad Commission, 367
receipts, how returned and accounted for, 182
Train despatcher and his work, 163, 422
Train despatching, 162
old and new, 187
Train orders and rules, 164
Train signals, bell-cord and other, 237
Train work, irregularity of, 399
Trainmen, accidents to, 393
and tramps, 386
Trains, rules for running, 162
Tramways, Roman, of stone, 1
Transfer freight stations, 288
Transportation, cost of, 43
conducting, 159
department and the car-accountant, 275
Trestles, wooden, 78
Trevithick, Richard, 2
Tribunal, proposed, for adjusting differences between railways and
their employees, 376
Trucks for cars, 7, 108
for locomotives, 4, 107, 109
Trunk lines compared, 428
Trunk-line pool, origin and history, 365
Truss-bridge, typical American, 86
Tubular bridges, 80
Tunnels, 59
American, 23
connected by a bridge, 55
difficulties of construction, 62
great, 62
how avoided, 23
located by triangulation, 53
Mont Cenis, 63
St. Gothard, 63
Underground Railway, London, 97
Union Pacific Railway system, extent of, 370
Vacuum-brake, 193, 195
Vail, Theodore N., 317, 322
Valleys, how crossed by a railway, 49
Valve-motion arrangements, 118
Vanderbilt business methods, 351
Vanderbilt, Commodore, 318, 340
Vanderbilt, Cornelius, 350, 424
Vanderbilt, William H., 318, 340
Verrugas Viaduct, 55
Vestibule train, luxury of, 248
as a safety device, 224
Viaducts, American metal, 79
Victoria Bridge, 80
Waddell, A., 323
Wagner Palace Car Company, 242
Wagon cars, 290
War, the late, effect of, on railway growth, 348
Washington Bridge over the Harlem River, 77, 94
Waste and saving in supplies, 302
Water-jet method of sinking piles, 68
Watt, James, 1
Way-bill and its theory, 181
Westinghouse air-brake, 195, 196
Westinghouse, George, Jr., 200, 237
West Point Foundry as a locomotive shop, 104
Whipple, Squire, 28
Winans, Ross, 7, 108
Yardmaster's duties, 283
Young Men's Christian Association, Railway Department, 424
TRANSCRIBER'S NOTE
Italic text is denoted by _underscores_.
Bold text is denoted by =equal signs=.
A superscript is denoted by ^x for example 12^1.
Obvious typographical errors and punctuation errors have been
corrected after careful comparison with other occurrences within
the text and consultation of external sources.
Basic fractions are displayed as ½ ¼ ¾; other fraction are shown in
the form a/b as 1/117 or 39-2/10 for example.
A large dense table spanning two pages in the original book (page 158
and 159) has been split into 4 parts, with column #1 (engine number)
being repeated in each part. The vertical column headings have been
replaced by a key, A B etc, with an explanation of the keys at the
beginning of each part. Some cell values were unclear in the scanned
image and a best guess of the digit has been made.
Another large table at page 447 has been split into 2 parts.
In several tables with dollar.cent values the decimal point is faint
or missing. For consistency the decimal point has been inserted in
all cases.
Footnote #31 had no anchor; this has been added in the chapter title.
Nine consecutive full-page illustrations placed after page 428
have detailed maps and Gantt charts and many have large amounts of
text on them. Most of this text, and the Gantt chart information,
have been copied and placed under the illustration as part of the
caption.
In the organization chart on page 185, it is very likely that the
Train Master and the Station Agents were all intended to report
to the Superintendant of Transportation. The missing connecting
line has been inserted using a dotted line to indicate this
insertion.
Except for those changes noted below, all misspellings in the text,
and inconsistent or archaic usage, have been retained. For example,
untravelled; sirup; smouldering; box car, box-car; cast iron,
cast-iron.
Pg 42, 'from 1 to 10' replaced by 'from 0 to 10'.
Pg 114, 'have ournal-boxes' replaced by 'have journal-boxes'.
Pg 392, 'no one brakeman' replaced by 'not one brakeman'.
Pg 416, 'fusilade' replaced by 'fusillade'.
Comments
Log in to leave a comment.
The American Railway: Its Construction, Development, Management, and AppliancesChapter III: Use and Abuse of Cars (7)
0%6 min left in chapter