Skip to content

Chapter IV: Introduction (3)

Text size

The ends of the thwarts were mortised into the gunwales and also secured by lashings. The number of thwarts varied with the tribal type, the size, and the purpose of the canoe. Usually an odd number, from three to nine, were used, though occasional canoes had two or four thwarts. Very small canoes for hunting might have only two or three thwarts, but most canoes 14 to 20 feet long had five. Canoes intended for portaging usually had one thwart at midlength to aid in lifting the canoe for the carry position. The distance between the thwarts might be determined by structural design, or might be fixed so as to divide the cargo space to allow proper trim. The thwarts might serve as backrests for passengers, but were never used as seats. There was no standard form for the shape of the thwarts, which varied not only to some degree by tribal classification, but even among builders in single tribe. They were usually thickest and widest over the centerline of the canoe, tapering outboard and then spreading again at the gunwales to form a marked shoulder at the mortise. The lashings to the gunwales often passed through two or more holes in this shoulder.

The ribs, or frames, of most canoes were very closely spaced and were wide, flat, and thin. They ran in a single length from gunwale to gunwale. In canoes having ~V~-sections near the ends, the ribs were often so sharply bent as to be fractured slightly. Across the bottom they were wide but above the bilge they tapered in width toward the end, which was either a rounded point or a beveled or rounded chisel-edge. The ribs were forced under the gunwales so that the heads fitted into the bevel, or into notches or holes at the underside and outboard edge of the gunwale, between it and the bark cover. By canting the rib to bring its ends into the proper position and then forcing it nearly perpendicular, the builder brought enough pressure on the bark cover to mold it to the required form. Bulging of the bark at each frame was prevented by a thin plank sheathing. The ribs in many Eastern canoes were spaced so that on the bottom they were separated only by a space equal to the width of a rib.

Each piece of sheathing, better described as a "splint" than as "planking," was commonly of irregular form. The edges were often beveled to a marked thinness. While some builders laid the sheathing edge-to-edge in the bark cover, others overlapped the edges. Nearly all builders feathered the butts and overlapped them slightly. The sheathing was held in position by a number of light temporary ribs while the permanent frames, or ribs, were being installed. It is to be noted that the sheathing was neither lashed nor pegged; it remained fixed in place only through the pressure of the bent ribs and the restraint of the bark skin.

The exact method of fitting the sheathing varied somewhat from area to area, but not in every instance from tribe to tribe. The bottom sheathing used by some eastern Indians was in two lengths. The individual pieces were tapered toward the stems and the edges butted closely together. The sides were in three lengths, but otherwise similarly fitted. The butts lapped very slightly. In a second method, used to the westward, the sheathing was laid edge-to-edge in two lengths, with the butts slightly lapped. The center members of the bottom, usually five, were parallel-sided, but the outboard ends of those at the turn of the bilges were beveled, or snied, off. The members further outboard were in one length, with both ends snied off. The bottom thus appeared as an elongated diamond-form. The topside sheathing was fitted as in the first instance.

GUNWALE LASHINGS, examples made by Adney: 1, Elm-bark, Malecite; 2, St. Francis; 3, Algonkin; 4, Malecite.]

GUNWALE-END LASHINGS, examples made by Adney: Athabascan (large), Ojibway (small).]

A variation in the second style used three lengths in the centerline sheathing. In still another variation a centerline piece was laid in two lengths without taper, the next outboard piece was then cut in the shape of a broad-based triangle, and the rest were laid in two lengths, with the sides parallel to the sides of the triangular strake and with their ends snied off against the centerline pieces. In a fourth style short pieces, roughly elongate-oval in shape, were overlapped on all sides and laid irregularly so that when in place they appeared "thrown in." With this style, the midship section was laid first and secured by a temporary rib, then the next toward the ends, with the butts shoved under the ends of the middle section. The next series was similarly laid so that the top member of each butt-lap faced toward the ends of the hull and was under a rib. The ends were not cut square across, but were either blunt-pointed or rounded. Five lengths of sheathing were often used, and the widths of the individual pieces of sheathing were rarely the same, so the seams were not lined up and presented an irregular appearance in the finished canoe. The sheathing was thin enough to allow it to take the curve of the bilge easily.

SPLINTS ARRANGED in various ways to sheath the bottom of a canoe: 1, Micmac, Malecite; 2, Central Cree, Têtes de Boule, etc.; 3, Montagnais; 4, Algonkin, Ojibway, etc.]

If the sheathing was lapped, the overlap was always slight. In some old canoes a small space was left between the edges of the sheathing, particularly in the topsides. In some northwestern bark canoes there was no sheathing; these used a batten system somewhat like that in the Eskimo kayak, except that in the bark canoes the battens were not lashed to the ribs, being held in place only by pressure. These kayak-like bark canoes had a bottom framework formed with chine members; some had a rigid bottom frame of this type, while others had bottom frames secured only by rib pressure. The purpose of the sheathing, it should be noted, was to protect the bark cover from abrasion from the inside, to prevent the ribs from bulging the bark, and to back up the bark so as to resist impacts; but in no case, even when battens were employed, as in the Northwest, did the sheathing add to the longitudinal strength of the bark canoe. The principle of the stressed rib and clamped sheathing, which is the most marked characteristic in the construction of the North American Indian bark canoe, is fundamentally different from that used in the construction of the Eskimos' skin craft.

A wide variety of framing methods are exhibited in the construction of the ends, or stems, of bark canoes. In the temporary types of the East, the bark was trimmed to a straight, slightly "ram" form and secured by sewing over two battens, one outboard on each side. Birch-bark canoes of the East usually had an inside stem-piece bent by the lamination method to the desired profile, the heel being left unsplit; as usual, the laminations were spirally wrapped, often with basswood-bark thongs. The stem-piece was then placed between the bark of the sides, and the bark and wood were lashed together with an over-and-over stitch. Sometimes variations of the short-and-long form of stitch were used here, and some builders also placed a halved-root batten over the ends of the bark before lashing to form a stem-band as protection to the seam. In some canoes the end lashing passed through holes drilled in the stem-pieces, often with the turns alternating in some regular manner through and around the stem-piece.

The stem-pieces were generally very light, and in some canoes the head was notched and sharply bent down and inboard, so that it could be secured to the ends of the gunwales. Some tribal types had no inner stem-piece, and the stem profiles were strengthened merely by the use of two split-root or halved-sapling battens, one on each side, outside the bark and under the sewing.

END DETAILS, INCLUDING CONSTRUCTION OF STEM-PIECES and fitting of bark over them, ending of gunwale caps at stem heads, and the headboard, with its location. Lamination of the stem pieces shows fewer laminae than is common. (_Sketches by Adney._)]

Birch-bark canoes to the westward used battens under the end lashing as well as rather complicated inside stem-pieces. In some parts of the West and Northwest, the ends were formed of boards set up on edge fore-and-aft, the bark being lashed through all, with the boards projecting slightly outboard of the ends of the bark cover to form a cutwater.

To support the inside stem-piece, some form of headboard was usually fitted near each end after the sheathing was in place. These were shaped to the cross-section of the canoe so as to form bulkheads. In some canoes, these miniature bulkheads stood vertical, but in others they were curved somewhat to follow the general curve of the end-profile, and this caused them to be shaped more like a batten than a bulkhead. Bent headboards were sometimes stepped so as to rake outboard. Sometimes the form of the headboard permitted the gunwale members to be lashed to it, and often there was a notch for the main gunwale on each side.

The headboards were sometimes stepped on the unsplit heel of the stem-piece; a notch was made in the bottom of the headboard to allow this. In two types of canoe in which there was no inner stem-piece, the headboards were stepped on short keel pieces, or "frogs," fore-and-aft on the bottom and extending slightly forward of the end of the sheathing to reinforce the forefoot. The purpose of the headboard was to strengthen the stem-piece, and in many cases it was an integral member of the end structure itself and helped to maintain its form. The headboard usually served to support the gunwale ends in some manner, it stretched the bark smooth near the stems, and it secured the ends of the sheathing where support from a rib would have been most difficult to obtain. Many canoes had the space between the headboard and the stem-piece stuffed with shavings, moss, or other dry material to help mold the bark to form beyond the sheathing in the ends. Some tribal groups decorated the headboards.

In a few canoes, the stem-piece was additionally supported by a short, horizontal member stepped in the forward face of the headboard and projecting forward to bear on the after side of the stem-piece. The latter was sometimes bent back onto itself above this member to form a loop around the top of the end-profile, and the gunwale ends or a part of the gunwale structure were secured to it. This complicated bending of the stem-piece, in conjunction with use of a headboard and a brace member, served to stiffen the end structure sufficiently to meet the requirements of service.

MALECITE CANOE OF THE TYPE DESCRIBED IN THIS CHAPTER. This 2½ fathom St. John River canoe represents the last Malecite birch-bark model, and usually was fastened with tacks and nails, rather than with root lashings and pegs as described here.]

The use of a bark cover over the gunwale ends has already been mentioned. In some eastern canoes, this was placed under the cap and outwale pieces and extended below the latter in a shallow flap on which the owner's mark or other decoration might appear; the flap was in fact a kind of name board. Such flaps do not appear on the partly decked bark canoes of the Northwest.

This general description of the structure of the bark canoes is sufficient to permit the explanation of the actual construction of a bark canoe to be more readily understood, and it also serves to illustrate the close connection between the method of construction and the formation of the lines, or model, of bark canoes. From the description, too, it can be seen that while the shape of a bark canoe was partially planned during the construction the control of every part of the model could not be maintained with the same degree of precision as in the building of an Eskimo skin boat or an Indian dugout.

_Construction_

One aspect of canoe construction, the Indian method of making measurements, was briefly mentioned (p. 8) under a discussion of the origin of the measurement known in French Canada as the _brasse_. This was the distance from finger-tip to finger-tip of the arms outstretched; in the fur trade in English times it was known as the fathom and it appears to have been about 64 inches, or less than the nautical fathom of 6 feet. Other measurements used were the greatest width of the ball of the thumb, which is very close to an English inch, and the width of the four fingers, each finger-breadth being close to three-fourths of an English inch. The length of the forearm, usually from the knuckles of the clenched hand to the elbow, was also employed by some Indians, as a convenient measurement.

Measurements in these units might be memorized and used in building, but many Indians used measuring sticks, and these served as "foot-rules." They were sometimes squared and were painted as well as notched.

A Malecite Indian, interviewed in 1925, had three such sticks for canoe building. One, for the length of the gunwale frame, was half the total length required; it was notched to show the distance at which the ends of the gunwales were lashed and also the position of the thwarts. Such a stick would be about 7 feet long for a 16-foot canoe, 8 feet for an 18-foot canoe. The second stick was notched to show half the length of each of the thwarts. The third stick had notches showing the height of the gunwale at each thwart and at the end, four notches in all for the half-length of the canoe. This stick measured from the surface of the building bed, not from a regular base line.

The method of measuring canoes appears to have been fairly well standardized, at least in historical times. As stated earlier, length was commonly taken over the gunwales only, and did not include the end profiles, which might extend up to a foot or slightly more beyond the gunwale ends, bow and stern. However, in certain old records the overall length is given, and in various areas other methods of measurement existed. Where a building frame was used, the given length of the canoe was the length of this frame; usually this approximated the length of the gunwales. The width of a canoe was measured by the Indian from inside to inside of the main gunwale members. The extreme beam might be only 2 or 3 inches greater than the inside measurement of the gunwales, but if the sides bulged out, the beam might actually be 6 or more inches greater. The depth was usually measured from the inside of the ribs to the top of the gunwale but in building it was measured from the surface of the building bed to the bottom of the main gunwales, as noted above in the description of the measuring sticks.

Thus it will be seen that the Indian measurements constituted a statement of dimensions primarily useful to the builder, for their main purpose was to fix the proportions rather than establish the actual length, width, and depth. Today we state the length of a canoe in terms of extreme overall measurement; the Indian was inclined to state the length in building terms, giving dimensions applicable to the woodwork only, just as the old-time shipbuilder gave the keel length of a vessel instead of the overall length on deck.

The building site was carefully selected. The space in which the canoe was to be set up had to be smooth, free of stones and roots or anything that might damage the bark, and the soil had to be such that stakes driven into it would stand firmly. A shady place was preferred, as the bark would not dry there as fast as in sunlight. Since the construction of a canoe required both time and the aid of the whole Indian family, the site had to be close to a suitable place for camping, where food and water could be obtained. It is not surprising, therefore, to find canoe building sites that apparently had been used by generations of Indians.

The preparation of the building bed was controlled by the intended form of the canoe to be built. If the bottom of the canoe was to be rockered, the cleared ground was brought to a flat surface for the length required for setting up the canoe. If the rocker was to be great, the middle of the bed would be slightly depressed. If the bottom was to be straight fore-and-aft, or very nearly so, the bed was crowned from 1½ to 2 inches higher in the middle than at the ends, so that the canoe was first set up with a hogged bottom. Very large canoes such as were used in the fur trade required as much as 4 inches crown in the building bed. Other dimensions being equal, the amount of crown was usually somewhat greater in canoes having bulging sides than in ones having more upright or flaring sides. Canoe factories such as were operated in certain fur-trading posts sometimes had a plank building bed suitably crowned and drilled for setting the stakes.

Two methods of setting up the canoe were used. In most of the eastern area, the gunwales were put together and used to establish the plan outline of the canoe on the building bed. But a building frame was used for constructing the various narrow-bottom canoes having flaring sides, and for some other tribal forms. The frame, made in the same general form as the gunwales when assembled, but less wide and sometimes much shorter, could be taken apart easily, allowing it to be removed after the canoe was built; hence it could be used to build as many canoes as desired to the same dimensions as the first, and was retained by the builder as a tool, or pattern, for future use.

The method of construction in which gunwales only were used in setting up the canoe will be explained first in order to show the general technique of construction. Use of the building frame will then be described. Important deviations from these methods will be described in later chapters under the individual tribal types in which they occur.

The Malecite canoe, a straight-bottomed craft about 19 feet long and 36 inches beam, is used as the example, hence the method of building to be described is that generally employed in the East, where variations in construction mainly involve the use or omission of structural elements.

The gunwales are the first members to be formed. In the Malecite canoe these are the inner gunwales, as the canoe will have outwales and caps. The gunwales are split from white cedar to produce battens that will square 1½ inches when shaped. The gunwales are tapered each way from midlength, where they are 1½ inches square, to a point 3 inches short of the ends, where they are ¾ by 1 to 1¼ inches. The edges of the gunwales are all rounded, and the outboard bottom edge is beveled almost ½ inch, at 45° to the bottom of the member. The last 3 inches at each end is formed like half a blunt arrowhead, as shown in the sketch of the member on page 31. The gunwales will be bent, side to side, on the flat as far as the ends are concerned, so the blunt arrowhead is formed on one of the wide faces of the ends as shown. The arrowhead form allows a neat joint when the gunwale ends are brought together, pegged athwartships, and then wrapped with a root lashing. In forming and finishing the gunwales, a good deal of care is required to get them to bend alike, so that the centerline of the finished frame will be straight and true.

To take the ends of the middle thwart, a mortise ¼ by 2 inches is cut in each gunwale member athwartships at exactly midlength, the length of the mortise being with the run of the gunwale. In it, the middle thwart, 33 inches long, is fitted. Made of a ⅞-inch by 3-inch piece of hard maple, the thwart tapers slightly in thickness each way from its center to within 5 inches of the shoulders, which are 30 inches apart. The thickness at a point 5 inches from the shoulder is ¾ inch; from there the taper is quick to the shoulder, which is ⁵⁄₁₆ inch thick, with a drop to ¼ inch in the tenon. The width, 3 inches at the center, decreases in a graceful curve to within 5 inches of the shoulder, where it is 2 inches, then increases to about 3 inches at the shoulder. The width of the tenon is, of course, 2 inches, to fit the mortise hole in the gunwale. The edges of the outer 5 inches of the thwart are rounded off or beveled a good deal; inboard they are only slightly rounded.

The thwart is carefully fitted to the gunwale members and the ends are pegged. Some builders wedged the ends of this thwart from outside the gunwales, the wedge standing vertical in the thwart so that the gunwale would not split; however, it is not certain that wedging was used in prehistoric times, although it is seen in some existing old canoes. The pegs used in this canoe are driven from above, into holes bored through the gunwale and the tenon of the thwart to lock all firmly together. Three holes are then bored in the broad shoulders of the thwart about 1½ inches inboard of gunwale for the root lashing that is also used.

The ends of the gunwale members are now brought together, and to avoid an unfair curve appearing at the thwart in place, short pieces of split plank or of sapling, notched to hold them in place, are inserted between the gunwale members as temporary thwarts at points about 5 feet on each side of the middle thwart. After the ends are brought together and the final fitting is carried out, a peg is driven athwartships the ends and a single-part root lashing is carefully wrapped around the assembly.

Some canoe builders omitted the blunted half-arrowhead form at the gunwale end. Instead, the inside faces were tapered to allow the two parts to bear on one another for some distance. The gunwales were then pinched together and lashed with one or more wrappings. Finally, a thin wedge was sometimes driven from inboard between the two gunwale ends to tighten the wrappings. The wedges were usually so carefully fitted as to be difficult to identify. It is probable that this wedged gunwale ending represents the prehistoric form, and the blunted half-arrowhead ending is a result of the use of steel tools.

After the ends of the gunwales have been securely fastened together, the first pair of permanent thwarts is fitted. These are located 36 inches, center to center, on each side of the middle thwart, a distance that determines the centers of the mortises in each gunwale member. Each thwart, made from a ¾-inch by 3-inch piece, tapers smoothly in thickness from the ¾-inch center to the ⁵⁄₁₆-inch shoulder. The tenon is of the same dimensions as that of the middle thwart, the width takes the same form as that of the middle thwart, and the edges are similarly beveled and rounded. The distance between the shoulders, taken along the centerline, is 22½ inches, and the centerline length of the thwart 25½ inches. However, the shoulders and ends of the tenons must be bevelled to follow the curve of the gunwales hence the extreme length of the thwart is actually very close to 26 inches. The worker determines the bevel of the shoulders by fitting the thwart to the run of the gunwales, the temporary thwarts being shifted so that the distance between the gunwales equals that set by the measuring stick. These two thwarts having been fitted, the tenons are pegged as before, but in the shoulders only one lashing hole is bored instead of the three employed in the middle thwart.

MALECITE CANOE BUILDING, 1910. (_Canadian Geological Survey photos._)

Weighting gunwales on bark cover on building bed.

Resetting stakes.

Shaping bark cover and securing it to stakes.]

FIRST STAGE OF CANOE CONSTRUCTION: assembled gunwale frame is used to locate stakes temporarily on building bed. Instead of the gunwales, a building frame was used in some areas. (_Sketch by Adney_.)]

The second pair of thwarts is placed 30 inches, center to center, from the first pair, one at each end, and on the basis of this measurement the tenons are cut as for the others. These two thwarts are made of ⅝-by 4-inch pieces tapering in thickness each way from the center to the shoulder, where they are a scant ⁵⁄₁₆ inch thick, the tenons having the same dimensions as in the other thwarts. In width the thwarts are worked to an even 3 inches from shoulder to shoulder, but in the form of a curve so that when each thwart is in place its center will be bowed toward the ends of the canoe, viewed from above. As in the first pair, the shoulders and ends are cut to a bevel to fit the gunwale; at the centerline they each measure 12 inches shoulder-to-shoulder in a straight line athwartships and 15 inches end-to-end. Allowing for bevel, the maximum length is just over 15-⁵⁄₁₆ inches. These thwarts are drilled for single gunwale lashings and the corner edges are well rounded from shoulder to shoulder. The distance from the centerlines of these last thwarts at the bow and stern to the extreme ends of the joined gunwales is 33 inches, so the finished gunwale length is 16 feet.

After the endmost thwarts are pegged into place, the temporary stays are removed. At each step of construction the alignment of the gunwales is checked by measuring with the measuring sticks and by sighting, since the shape of the assembled gunwales, in this case of the inner gunwales, is very important in determining the sharpness of the completed canoe and the fairness of its general form.

The assembled gunwales are now ready to be laid on the building bed which, for the Malecite canoe, is 20 feet long, about 3½ feet wide and is raised about 1½ inches at midlength so that the canoe bottom will be straight when the craft is in the water. The gunwale frame having been carefully centered on this bed, with the middle thwart exactly over the highest point in the surface of the bed, some scrap split-planking is laid across the gunwales and the whole weighted down with a few flat stones. Next, 34 stakes from 30 to 50 inches long are prepared, each made of a halved length of sapling. Around the outside of the gunwale frame 26 of these are driven in pairs opposite one another across the frame, about 24 inches apart and placed so that none is opposite a thwart, except for the stakes at the extreme ends of the gunwale frame, which are spaced about a foot from their nearest neighbors and are face-to-face, about 1½ inches apart. All the stakes are driven with the flat face about an inch from the gunwale frame and parallel to its outside edge. Finally two more pairs of stakes are driven at each end, the first pair about a foot beyond the end of the gunwale frame and 1½ inches apart, the second about 6 inches beyond these and similarly spaced. The length between the outermost stakes, measured over the gunwale frame, is about 18½ feet. Great care is taken to line up the last pairs of stakes with the centerline of the gunwale frame.

SECOND STAGE OF CANOE CONSTRUCTION: stakes have been removed and laid aside, and the gunwales shown in first stage have been removed from the building bed. The bark cover is laid out on the building bed, and the gunwales are in place upon it, weighted down with stones. (_Sketch by Adney_.)]

If the canoe is to have a slight rocker near the ends and is to be straight over the rest of the bottom, the ends of the gunwale frame will be blocked above the building bed so that the frame is not hogged on the bed.

After the builder is satisfied with the staking, each stake is carefully pulled up and laid to one side, off the bed but near its hole. The weights are then removed from the gunwale frame, which is lifted from the bed and laid aside, and the bed, if disturbed is repaired and re-leveled.

The roll of birch bark is now removed from storage, perhaps in a nearby pool where it has been placed to keep it flexible, and unrolled white side up on the building bed. As the bark dries, it will become more and more stiff, so it will be necessary to moisten it frequently during construction to maintain its flexibility.

The bark is usually long enough, but often it is not wide enough. If the bark is too short, it may be pieced out at this time, or later. If it is not wide enough it is centered on the bed; the piecing out will be done later. The gunwale frame is now laid on the bark, care being taken to place it as nearly as possible in its former position on the bed.

The bark outside the frame is then slashed from the edge to a point close to the end of each thwart, and also to points along the frame halfway between the thwarts, so that the edges can be turned up. While it is being slashed, the bark cover is bent slightly, so that it is cut under tension. Later, when the required shape can be determined, these slashes will be made into gores, the Malecite canoes having flush seams, not overlaps, in the topsides and bottom. If a fault is noted along the outer edge of the bark, a slash may be placed so as to allow the fault to be cut out in the later goring; irregularity in the position of the cuts does no great harm to the progress of building these canoes. The slashes are usually carried to within an inch of the gunwales on the bed. It is not customary to slash the bark close to the end, there the bark can usually be brought up unbroken, depending upon the form of the end.

When the bark has been cut as described, it can be turned up smoothly all around the frame so that the stake holes can be seen and a few of the stakes can be replaced. The frame and the bark are then realigned so that all stakes may be replaced in their holes without difficulty. When the frame and bark are aligned, the frame is weighted as before and the bark is turned up all around it, the stakes being firmly driven, as this is done, in their original holes. The longest stakes are at the ends of the frame, as the depth of the hull is to be greatest there. The tops of each pair of opposite stakes are now tied together with a thong of basswood or cedar bark, to hold them rigid and upright.

MALECITE CANOE BUILDERS NEAR FREDERICTON, N.B., using wooden plank building bed with stakes set in holes in the platform. This was a late method of construction, which probably originated in the early French canoe factory at Trois Rivières, Que.]

After the bark is turned up around the frame, its lack of width becomes fully apparent. At this stage, some builders fitted the additional pieces to gain the necessary width; others did it later. The method of piecing the bark cover and the sewing technique, however, is explained here.

The bark is pieced out with regard to the danger of abrasion that would occur when the canoe is moving through obstructions in the water, or when it is rolled or hauled ashore and unloaded. If the bark is to be lapped below the waterline, the thickness of the bark of both pieces in the lap is scraped thin so a ridge will not be formed athwart the bottom; here, however, most tribes used edge-to-edge joining. If there are laps in the topsides, the exposed edge is toward the stern; if in the midlength, upward toward the gunwale; and if it is in the end the lap may be toward the bottom, because this makes it easier to sew, and because in the ends of the canoe there is less danger of serious abrasion. Many tribes used edge-to-edge joining everywhere in the topsides so that the direction of lapping was not a matter of consideration. The type of goring, whether by slash and lap or by cutting out a ~V~-shaped gore, will, of course, have much to do with the selection of the method of sewing to be used.

It is to be recalled that in canoe building no needle was used in sewing the bark; the ends of the root strands were sharpened and used to thread the strand through the awl holes. Much of the topside sewing in a bark canoe was done with small strands made by splitting small roots in half and then flattening the halves by scraping. Large root strands quartered and prepared in the same manner, or the cores of these, were sometimes used in heavy sewing or lashing at the gunwale or in the ends of a canoe.

As noted previously, root thongs were used well water-soaked or quite green, for they became very stiff and rather brittle as they dried out. Once in place, however, the drying did not seem to destroy their strength. Rawhide was also used for such sewing by some tribes.

The sewing was done by Indian women, if their help was available, and the forms of stitching used in canoe building varied greatly. The root sewing at the ends of the canoes ranged from a simple over-and-over spiral form to elaborate and decorative styles. Long-and-short stitching in a sequence that usually followed some formal pattern was widely used. Among the patterns were such arrangements as one long, four short, and one long; or two longs, two or three shorts, and two longs; or one short, five of progressively increasing length, and then one short; or six progressively longer followed by six progressively shorter. Cross-stitching, employing the two ends of the sewing root as in the lacing of a shoe was also common. Sometimes this was combined with a straight-across double-strand pass to join the ends of the ~X~. The harness stitch, in which both ends of the sewing root were passed in opposite directions through the same holes, was often used, as was the 2-thong in-and-out lacing from each side used in northwestern canoes having plank stem-pieces.

If the root strand was too short to complete a seam, instead of being spliced or knotted the end was tucked back under the last turns or stitches, on the inside of the bark cover. In starting, the tail was placed under the first turn of the stitch, so that it could not be pulled through. To finish sewing with double-ended strands, as in the harness stitch, both ends were tucked under the last turn or two.

Commonly two or more turns were taken through a single hole in the bark; this might be done to clear some obstruction such as a frame head at the gunwale, or to provide a stronger stitch, or turn, as in the harness stitch and others, or to allow for greater spacing between awl holes in the bark. (Since the awl blade was tapered, the size of the hole it made in the bark could be regulated by the depth of penetration of the blade as it was turned in the hole.)

The length of stitches varied with the need for strength and watertightness. Long stitches were about I inch, short stitches from about ⅜ to ½ inch in length. The run of the grain, of course, was a consideration in the length of stitch used.

SEWING: two common styles of root stitching used in bark canoes.]

The piecing of the side panels was done with a great variety of sewing styles, according to strength requirements. The strain put upon the bark in molding it by rib pressure was greater in the midlength than in the ends; and the sewing differed accordingly. The over-and-over spiral, with a batten under the sewing, was used for sewing in the midlength, as was back-stitching, a variety of basting stitch in which a new pass is started about half way between stitches, thus forming overlapped passes or turns. Back-stitching was usually done in a direction slightly diagonal to the line of sewing, so as to cross the grain of the bark at an angle with each pass. The double-thong in-and-out stitch, in which each thong goes through the same hole from opposite sides, was frequently used. The simple, spiral over-and-over stitch was used in sewing panels in the ends of canoes, as was the simple, in-and-out basting stitch using either a single or double strand.

When the sides were pieced out edge-to-edge, the sewing was usually done spirally, over and over a narrow, thin batten placed outside the bark cover. This batten might be either a thin split sapling or, more commonly, a split and thinned piece of root. If the pieced-out sides were lapped, then the harness stitch was commonly used. The lap might be some inches wide to decrease the danger of splitting while the bark was being punched with the awl, afterward the surplus was cut away leaving about a half inch of overlap. On rare occasions the strength of a lapped-edge seam was increased by the use of a parallel row of stitching.

COMPARISON OF CANOE ON THE BUILDING BED (above), with gunwales or building frame weighted down by stones inside bark cover, and (below) canoe when first removed from building bed during fifth stage of construction. (_Sketches by Adney._)]

In making the canoe watertight, it is to be remembered that some forms of stitch make the bark lie up tight all along its edges while others bind only where the stitch crosses the seam. The in-and-out stitch, which was used only above the waterline, cannot be pulled up hard without causing the bark to pucker and split and cannot be made very watertight with gum. The over-and-over stitch, in either a spiral form or square across the seam on the outside and diagonally on the inside, is very strong; when a batten is used under the stitches it can be pulled up hard and allows a very watertight gumming. When this style of sewing is used without a batten across the run of the grain, as in the gore seams, it cannot be pulled up as hard, but will serve. Back-stitching, which was much used in the topsides, can be pulled up quite hard and makes a tight seam when gummed, as do the harness stitch and cross-stitch. The ends, regardless of the style of sewing used, were more readily made tight by gumming than the other seams in a bark canoe.

Two basic methods, with some slight and unimportant variations, were used to fasten the bark to the gunwales. One employed a continuous over-and-over stitch, the other employed groups of lashings. On a canoe with the lashing continuous along the gunwales, the turns were made two or more times through the same hole on each side of each rib head to allow space for them. This might also be done where the lashing was in groups, as described above. Usually, a measuring stick was used to space the groups between thwart ends so that each group came between the rib heads. The groupings could be independent lashings, or the strand could be carried from one group to another. If the latter, it was passed along under the gunwale in a number of in-and-out stitches or in a single lone stitch either inside or out, or else it was brought around over the gunwale from the last full turn. Some tribes use both ends of the lashing, passing them through the same hole in the bark from opposite directions below the gunwales; the ends might be carried in the same manner in a long stitch to the next group. In some elm and other bark canoes employing basswood or cedar-bark lashings the bark was tied with a single turn at wide intervals; when roots were used in these, however, small groupings of stitches were customary. When group lashings were used with birch bark, the intervals between groups was usually relatively short, though in a few canoes the groups and intervals were of nearly equal length.

THIRD STAGE OF CANOE CONSTRUCTION: the bark cover is shaped on the building bed. The gores have been cut; part of the cover is shaped and secured by stakes and battens. "A" shows battens secured by sticks lashed to stakes. (_Sketch by Adney_.)]

In an independent group, the ends of the strand were treated as in whipping, the tail being under the first turns made and the end tucked back under the last--usually on the inside of the gunwales. Where there were inner and outer gunwales the lashing was always around both, and the tail might be jammed between them. If a cap was used on the gunwales, the lashings were always under it. The use of a knotted turn to start a lashing occurred only in the old Têtes de Boule canoes.

On the Malecite canoe, the sides are pieced out in one to three panels rather than in one long, narrow panel on each side. The panel for the midlength requires the greatest strength and is usually lapped inside the bottom bark. The latter is first trimmed straight along its edge, and the panel inserted behind it with a couple of inches of lap. Then the two pieces of bark are sewn together over a halved-root batten with an over-and-over stitch. (Other tribes used some form of the harness stitch, or a similar style, allowing great strength.) The middle panel does not extend much beyond the ends of the first pair of thwarts on each side of the middle. The next panels toward the ends are lapped outside the bottom bark and are sewn with the back-stitch. Then, if still another panel is required at each end, this too is lapped outside and is sewn in the lap with an in-and-out stitch. The ends of the panels are usually sewn with an over-and-over stitch that runs square with the seam outside and diagonally to it inside the bark. (The harness stitch was used here by some tribes, as were many forms of the cross-stitch.) The ends of the canoe and the gores have already been sewn during an earlier stage of the building process.

Once the sides are pieced out, the bark is ready to be turned up and around the gunwale frame and clamped perpendicularly. To effect this, small stakes are made by halving saplings, so that each half is about a half inch thick. The butt of each half is cut chisel-shaped, with the bevel on the flat side; the rounded face is smoothed off, and it may be tapered toward the head of the stake. Between two of the slashes a length of bark is now brought up against the outer stakes; against the bark the small, inside stake is placed with the round face of the chisel-pointed butt wedged against the outer face of the gunwale. The top is then levered against the outside stake, so that the flat face of each clamps the bark in place. The top of the inner stake is then bound to the outer.

CROSS SECTION of canoe on building bed during third stage of construction (above) and fourth stage. (_Sketch by Adney._)]

In setting the inside stakes, care is taken that their points do not pierce the bark. No inside stakes are required at the ends, as here the outside stakes are so close together in opposing pairs as to hold the bark in a sharp fold along the centerline of the cover. This of course is also true of the stakes beyond the ends of the gunwales.

After a few lengths of bark have been thus secured, they are faired between the stakes by inserting thin strips of split sapling, or battens of wood or root, along each side of the bark, under the inside and outside stakes. These battens are placed about halfway up the upturned bark. Some builders used long wooden battens, as this gave a very fair side when enough lengths were secured upright; others got the same results with short battens, the ends of which were overlapped between a pair of stakes on each side.

MULTIPLE CROSS SECTION through one side of a canoe on the building bed: at the headboard, middle, first, and second thwarts. Gunwale is raised and supported on sheering posts set under thwarts. Crown of the building bed is shown by varying heights of bottoms of the four sections.]

When the bark has been turned up and clamped, the gores may be trimmed to allow it to be sewn with edge-to-edge seams at each slash. This is usually done after the sides are faired, by moving the battens up and down as the cuts are made, then replacing them in their original position. The gores or slashes, if overlapped, are not usually sewn at this stage of construction.

With the inside stakes in place, the longitudinal battens secured, and the gores cut or the overlaps properly arranged, all is ready for sheering the gunwales. First the weights are removed from the gunwale frame so that it can be lifted. If the inside stakes have been properly made and fitted this can be done without disturbing the sides, though the ties across each pair of outside stakes may have to be slacked off somewhat. Before lifting the frame, some short posts, usually of sapling or of waste from splitting out the gunwales and thwarts, are cut in lengths determined by the measuring stick or from memory, one for each end of each thwart, and one for each end of the gunwale frame. Those under the middle thwart ends in this canoe are 7½ inches long, those under the next thwarts out from the middle will be 9 inches, those under the end thwarts will be 12 inches, and those at the gunwale ends will be 17 inches long. These posts, cut with squared butts, are laid alongside the bed. The gunwale frame is now lifted and the pair of posts to go under the middle thwart are stepped on the bark cover, the gunwale is lowered onto them, and while the frame and posts are held steady, stones are laid on a plank over the middle thwart. Next, the ends of the gunwales are held and lifted so that a pair of posts can be placed at the thwarts next out from the middle. More weights are placed over these, the operation is repeated for the end thwarts and, finally at the gunwale ends, so that the gunwales now stand on posts on the bark cover, sprung to the correct fore-and-aft sheer and steadied by the bearing of the outside of the gunwale frame on the rounded faces of the inside stakes. Now the sheer has been established and the depth of the canoe is approximated.

FOURTH STAGE OF CANOE CONSTRUCTION: bark cover has been shaped and all stakes placed. The gunwales have been raised to sheer height; "A" indicates the sticks which fix the sheer of the gunwales; "B" indicates blocks placed under ends to form rocker. Side panels are shown in place, and cover is being sewn to gunwales. (_Sketch by Adney._)]

To protect the bark cover from the thrust of the weights used to ballast the frame, some builders inserted small bark or wood shields for padding under the heels of the posts. By some tribes the posts were notched on one face, to fit inside the gunwales near the thwarts, and there were also other ways of assembling the gunwales themselves.

It should be apparent that the operations just described would serve only for canoes in which the sheer had a gentle, fair sweep. For canoes in which the sheer turned up sharply at the ends, the gunwale members might have to be split into laminations and prebent to the required sheer before being assembled into the gunwale frame. To accomplish this, the laminations were scalded with boiling water until saturated and then the gunwale members were staked out on the ground or tied with cords to set the wood in the desired curves as it dried out. The laminations were then wrapped with cord and the gunwale was ready to assemble. To produce a hogged sheer, the gunwales were made of green spruce and then staked out to season in the form desired; a hogged sheer was also formed by steaming or boiling the gunwale members at midlength.

The canoe, as now erected on the building bed, has a double-ended, flat-bottomed, wall-sided form. The gunwales are sprung to the proper breadth and sheer, and the bark is standing irregularly above them. At this point, on canoes not having outwales, the bark cover was laced or lashed to the gunwales. Since the Malecite canoe has outwales, these are now made and fitted. They consist of two white cedar battens about 19½ feet long, perhaps 1 inch wide, and ½ inch thick. The face that will be the outboard side is usually somewhat rounded, as are all the corners, and the corner that will be on the inside and bottom of each batten when it is in place is somewhat beveled. The outwales are placed between the bark and the outside stakes, the inside stakes being removed one by one as this is done. The removal of the inside stakes allows room for the outwale to be inserted in their place, between the outside stakes and the inner gunwale face, and it allows the bark to be brought against the outside face of the inner gunwales. In the process of fitting the outwales, the battens along the sides may have to be removed and replaced, or shifted, and the cross-ties of each pair of outside stakes may require adjustment. Beginning at midlength, the outwale is pegged through the bark cover to the inner gunwales at intervals of 6 to 9 inches. The pegging is not carried much beyond the end thwarts in any canoe and could not be in canoes having laminated gunwales near the ends.

The Malecite canoe has bark covers over the ends of the inner gunwales, and these are now fitted so that they can be passed under the outwales and clamped in place. The ends of the outwales are forced inside the stakes at and beyond the ends of the gunwales, assuming a pinched-in appearance there, and they may reach a few inches beyond the ends of the bark cover; they will be cut and shaped to the length of the finished canoe later.

The outwale pegs are made by splitting from a balk of birch, larch, or fir roughly squared dowels about ¼ inch square and 6 to 9 inches long. Each dowel is then tapered and rounded each way from the middle to form two shanks that are between ⅛ and ³⁄₁₆ inch in diameter over 2 to 3 inches of length. The ends may be sharpened by fire. The dowels are then cut in two, providing a pair of pegs with large heads. These are driven in holes drilled through the outwales, bark cover, and gunwales, and when well home, the protruding ends are cut off flush. Toward the ends of the gunwales, the spaces between the pegs increase, and at the extreme ends, the outwale will be lashed to the gunwale by widely spaced groupings of root strand. These are usually temporary, as the final lashing of the bark to the gunwales will secure the outwales.

After the outwales are secured in place, the bark is fastened to the assembled gunwales with group lashings. In the Malecite canoe being built, these are independent, each grouping consisting of eight to ten complete turns of the root strand. The intervals between, roughly 2 inches, are usually spaced by means of a special measuring-stick to insure evenness. Before the lashing is actually begun, however, the excess bark standing above the gunwales is cut away. The bark either is trimmed flush with the top of the gunwale, or enough is left for a flap that will fully cover the top of the inner gunwale, to be turned down under the lashing. The latter method, the stronger, was used by many builders. In making the turns in the group lashings, two or three turns may be taken through a single hole in the bark; the Malecites did this to avoid having the holes too close together. The result is that the group when seen from outboard appears as a ~W~-form, with only two or three holes in the bark for an entire group. Care is taken to lay up the turns over the gunwales neatly, turn against turn without open spacing or overlaps and crossings.

Comments

Log in to leave a comment.

The Bark Canoes and Skin Boats of North AmericaChapter IV: Introduction (3)

0%37 min left in chapter