Skip to content

Chapter C

Text size

Cabinet hinges, §55, p132
locks, §55, p64, p136
Calculating number of studs, §60, p39
quantities for brickwork, §61, p8
quantities for carpentry work, §61, p10
quantities for excavations, §61, p2
quantities for gas-fitting, Estimating and, §61, p40
quantities for heating and ventilating system, Estimating and,
§61, p35
quantities for joinery, §61, p23
quantities for lathing and plastering, §61, p22
quantities for painting, Estimating and, §61, p42
quantities for plumbing system, Estimating and, §61, p37
quantities for roofing, §61, p21
quantities for stonework, §61, p4
quantities, Scope of subject of estimating and, §60, p1
quantity of nails required, §60, p45
sheathing or rough flooring, §60, p40
the volume of an excavation, §60, p16
Care and maintenance of locks, §55, p69
Carpenter, Work per day of, §60, p42
Carpentry, §60, p38
Cost of, §61, p21
Table of cost of miscellaneous items of, §60, p45
work, Calculating quantities for, §61, p10
Casement adjusters, §55, p99
bolts, §55, p94
Casing nails, §55, p9
Cast-iron door knobs, §55, p71
-iron hinge butts, §55, p27
-iron sash weights, §55, p18
Catches, Cupboard, §55, p133
Elbow, §55, p134
Ceiling, Cost of yellow-pine, §61, p20
Yellow-pine porch, §61, p20
Cellar excavations, §61, p2
floors, Cost of cement, §60, p23
stairs, §61, p30
Cement cellar floors, Cost of, §60, p23
Centers, Sash, §55, p88
Chain bolts, §55, p110
Door, §55, p107
fastener, §55, p107
Chains, Sash, §55, p81
Transom, §55, p93
Chimneys, Construction of brick, §64, p49
Factory, §64, p45
Stability of brick, §64, p47
Table of capacities of, §64, p46
Chipped glass, §55, p158
Classification of factory buildings, §64, p2
Clinch nails, §55, p10
Coal storage in factories, §64, p42
Column footings, §64, p28
Columns, Strength of concrete, §64, p24
Strength of reinforced-concrete, §64, p25
Combination locks, §55, p67
Concrete, Advantages of reinforced, §64, p24
beams and girders, §64, p26
building blocks, Cost of, §60, p23
buildings, Data of cost of reinforced-, §60, p20
columns, Strength of, §64, p24
factory buildings, §64, p23
footings, §64, p14
footings and floor, §61, p7
footings, Cost of, §61, p7
Table of cost of plain gravel, §60, p19
Table of cost of plain stone, §60, p19
walls supporting cranes, §64, p39
window heads, §64, p27
work, Plain, §60, p18
work, Reinforced-, §60, p18
Construction of brick chimneys, §64, p49
Slow-burning, §64, p18
Types of mill, §64, p13
Contractor’s method of figuring excavation, §60, p14
Corner and strap hinge plates, §55, p44
Cornice, spandrels, etc., Cost of, §61, p20
Cornices, Measuring of, §60, p41
Cost of ashlar, §61, p6
of ashlar or cut stone, §60, p26
of ashlar or cut stone, Estimating, §60, p28
of baseboards, rails, and moldings, §60, p67
of brickwork, §60, p32
of building, Summary of, §61, p44
of buildings per cubic foot, Table of, §60, p3
of carpentry, §61, p21
of cement cellar floors, §60, p23
of common brickwork, §61, p10
of concrete building blocks, §60, p23
of concrete footings, §61, p7
of cornice, spandrels, etc., §61, p20
of ditch work, Estimating the, §60, p15
of door frames and doors, §60, p65
of electric wiring, §61, p41
of excavation, §61, p4
of excavation, Actual, §60, p12
of flagstones and curbing, §60, p26
of flooring, §61, p19
of framing, §61, p17
of framing and covering of building per square foot, §60, p41
Cost of gas-fitting, Estimates and, §60, p72
of granite, §60, p29
of gravel roofs, §60, p54
of hardware, §61, p35
of heating and ventilating system, §61, p37
of joinery, §61, p33
of labor for gas-fitting, §61, p41
of labor for installing plumbing system, §61, p40
of lathing, Measurement and, §60, p60
of laying wooden floors, Table of labor and, §60, p44
of mackite, §60, p38
of miscellaneous interior joinery, §61, p32
of miscellaneous items of carpentry, Table of, §60, p45
of molding, §60, p62
of painting, §60, p75; §61, p43
of paneling and wainscoting, §60, p67
of plain gravel concrete, Table of, §60, p19
of plain stone concrete, Table of, §60, p19
of plastering, §60, p59; §61, p23
of plumbing, Approximate, §60, p70
of plumbing system, §61, p40
of pressed brickwork, §61, p9
of reinforced-concrete floor slabs, Table of, §60, p22
of roof tiling per square, Table of approximate, §60, p53
of roofing, §61, p22
of rubble masonry, §60, p25; §61, p5
of sheathing and shingles, §61, p18
of slating per square, §61, p21
of slating per square, Table of approximate, §60, p51
of soft stone, §60, p28
of stairs, §60, p67; §61, p31
of structural steel, §60, p69
of terra-cotta floor arches, §60, p35
of terra-cotta partitions, Table of, §60, p36
of tiling, §60, p37
of verandas, §60, p68
of window frames and windows, §60, p63
of yellow-pine ceiling, §61, p20
Covering, Kinds of roof, §60, p46
of building per square foot, Cost of framing and, §60, p41
Cranes on concrete walls, §64, p39
Planning for traveling, §64, p37
Cranes, Track construction for traveling, §64, p39
Cremorne bolts, §55, p95
Cubic foot, Table of cost of buildings per, §60, p3
Cupboard buttons, §55, p134
catches, §55, p133
latches, §55, p132
Curbing, Cost of flagstones and, §60, p26
Cut nails, §55, p2
nails, Table of sizes of, §55, p6
stone, §61, p6
stone, Cost of ashlar and, §60, p26

Comments

Log in to leave a comment.

Hardware, estimating, and mill designChapter C

0%3 min left in chapter